IAC logo
IAC Assessment: SF0306
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0306
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $5,000,000-$10,000,000
# of Employees 7
Plant Area (Sq.Ft.) 108,900
Annual Production 200,000 Tons
Production Hrs. Annual 3,336
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $177,038 933,120 kWh $0.19
Natural Gas $484,306 71,132 MMBtu $6.81
TOTAL ENERGY COSTS $661,344
RECOMMENDED SAVINGS* $45,016 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,237
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$25,577
Cost:
$100
- - - - - - - - $25,577 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$25,577
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$847
Cost:
$576
$847 16,808 - - - - - - - - $847
16,808
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,056
Cost:
$1,000
- - - - $8,056 1,183 - - - - -
-
kWh
-
-
kW-months/year
$8,056
1,183
MMBtu
-
-
$
-
-
%
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,779
Cost:
$244
- - - - $1,779 261 - - - - -
-
kWh
-
-
kW-months/year
$1,779
261
MMBtu
-
-
$
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,806
Cost:
$921
$1,017 9,951 $333 27 - - $456 - - - $1,017
9,951
kWh
$333
27
kW-months/year
-
-
MMBtu
$456
-
$
-
-
%
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,040
Cost:
$4,422
$3,554 34,788 $1,486 120 - - - - - - $3,554
34,788
kWh
$1,486
120
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,055
Cost:
$1,905
$740 7,249 $226 18 - - $89 - - - $740
7,249
kWh
$226
18
kW-months/year
-
-
MMBtu
$89
-
$
-
-
%
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$856
Cost:
$1,449
$601 5,803 $255 20 - - - - - - $601
5,803
kWh
$255
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$45,016
Cost:
$10,617
$6,759 74,599 $2,300 185 $9,835 1,444 $545 - $25,577 - $6,759
74,599
kWh
$2,300
185
kW-months/year
$9,835
1,444
MMBtu
$545
-
$
$25,577
-
%
TOTAL IMPLEMENTED Savings:
$43,237
Cost:
$10,373
$6,759 74,599 $2,300 185 $8,056 1,183 $545 - $25,577 - $6,759
74,599
kWh
$2,300
185
kW-months/year
$8,056
1,183
MMBtu
$545
-
$
$25,577
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production