IAC logo
IAC Assessment: SF0309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product packaged Produce
NAICS 115114 - Postharvest Crop Activities (except Cotton Ginning)
SIC 0723 - Crop Preparation Services For Market
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 250,000
Annual Production 31,200,000 Pieces
Production Hrs. Annual 5,868
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,113,299 11,785,750 kWh $0.09
TOTAL ENERGY COSTS $1,113,299
RECOMMENDED SAVINGS* $190,901 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $190,901
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,330
Cost:
-
$6,098 95,555 $3,232 291 $6,098
95,555
kWh
$3,232
291
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$693
Cost:
-
$693 10,858 - - $693
10,858
kWh
-
-
kW-months/year
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$38,413
Cost:
$22,423
$26,447 414,461 $11,966 1,077 $26,447
414,461
kWh
$11,966
1,077
kW-months/year
04: 2.2114 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE Savings:
$1,035
Cost:
$760
$713 11,180 $322 29 $713
11,180
kWh
$322
29
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$38,810
Cost:
$45,147
$28,620 448,521 $10,190 917 $28,620
448,521
kWh
$10,190
917
kW-months/year
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,420
Cost:
$6,885
$4,821 77,512 $1,599 144 $4,821
77,512
kWh
$1,599
144
kW-months/year
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$96,200
Cost:
$80,000
$71,758 1,124,552 $24,442 2,200 $71,758
1,124,552
kWh
$24,442
2,200
kW-months/year
TOTAL RECOMMENDED Savings:
$190,901
Cost:
$155,215
$139,150 2,182,639 $51,751 4,658 $139,150
2,182,639
kWh
$51,751
4,658
kW-months/year
TOTAL IMPLEMENTED Savings:
$190,901
Cost:
$155,215
$139,150 2,182,639 $51,751 4,658 $139,150
2,182,639
kWh
$51,751
4,658
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand