IAC logo
IAC Assessment: SF0315
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0315
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product Asphalt, & Concrete
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 41
Plant Area (Sq.Ft.) 152,460
Annual Production 11,000,000 Pounds
Production Hrs. Annual 3,242
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $169,806 1,516,240 kWh $0.11
Electricity Demand $107,615 10,086 kW-months/year $10.67
Natural Gas $356,006 46,747 MMBtu $7.62
TOTAL ENERGY COSTS $633,427
RECOMMENDED SAVINGS* $3,924 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $794
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2
Cost:
$312
$2 24 - - - - - - $2
24
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2
Cost:
$206
- - - - - - $2 368 -
-
kWh
-
-
kW-months/year
-
-
$
$2
368
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$192
Cost:
$1,531
$1 18 $191 14 - - - - $1
18
kWh
$191
14
kW-months/year
-
-
$
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$16
Cost:
$8,242
- - - - $16 - - - -
-
kWh
-
-
kW-months/year
$16
-
$
-
-
MMBtu
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$723
Cost:
$468
$616 6 $107 8 - - - - $616
6
kWh
$107
8
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$790
Cost:
$2,311
$1 17 $789 61 - - - - $1
17
kWh
$789
61
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$600
Cost:
$1,082
$1 12 $599 47 - - - - $1
12
kWh
$599
47
kW-months/year
-
-
$
-
-
MMBtu
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$19
Cost:
$24
$19 - - - - - - - $19
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,186
Cost:
$2,422
$718 7 $468 36 - - - - $718
7
kWh
$468
36
kW-months/year
-
-
$
-
-
MMBtu
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6
Cost:
$16,353
$4 43 $2 247 - - - - $4
43
kWh
$2
247
kW-months/year
-
-
$
-
-
MMBtu
11: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$388
Cost:
$1,032
$269 2 $119 28 - - - - $269
2
kWh
$119
28
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$3,924
Cost:
$33,983
$1,631 129 $2,275 441 $16 - $2 368 $1,631
129
kWh
$2,275
441
kW-months/year
$16
-
$
$2
368
MMBtu
TOTAL IMPLEMENTED Savings:
$794
Cost:
$2,829
$3 41 $789 61 - - $2 368 $3
41
kWh
$789
61
kW-months/year
-
-
$
$2
368
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas