Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2007
Principal Product Packaged Produce
NAICS 115114 - Postharvest Crop Activities (except Cotton Ginning)
SIC 723 - Beauty Shops
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 125,000
Annual Production 357,000,000 Pounds
Production Hrs. Annual 4,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,645,617 20,069,749 kWh $0.08
Electricity Demand $587,059 40,259 kW-months/year $14.58
TOTAL ENERGY COSTS $2,674,267
RECOMMENDED SAVINGS* $721,631 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $440,697
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,653
Cost:
$244
$1,128 14,256 $525 35 - - $1,128
14,256
kWh
$525
35
kW-months/year
-
-
lb
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$229,277
Cost:
$80,000
$163,938 2,071,968 $65,339 4,352 - - $163,938
2,071,968
kWh
$65,339
4,352
kW-months/year
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,563
Cost:
$2,639
$6,138 77,576 $3,425 228 - - $6,138
77,576
kWh
$3,425
228
kW-months/year
-
-
lb
04: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$8,934
Cost:
$2,310
$8,934 112,918 - - - - $8,934
112,918
kWh
-
-
kW-months/year
-
-
lb
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,287
Cost:
$5,129
$9,551 115,706 $2,736 182 - - $9,551
115,706
kWh
$2,736
182
kW-months/year
-
-
lb
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$46,653
Cost:
$25,591
$34,389 434,652 $12,264 817 - - $34,389
434,652
kWh
$12,264
817
kW-months/year
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,837
Cost:
$3,351
$3,843 48,565 $1,994 133 - - $3,843
48,565
kWh
$1,994
133
kW-months/year
-
-
lb
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$32,070
Cost:
$22,400
$32,070 405,325 - - - - $32,070
405,325
kWh
-
-
kW-months/year
-
-
lb
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,014
Cost:
$5,542
$2,014 25,462 - - - - $2,014
25,462
kWh
-
-
kW-months/year
-
-
lb
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$754
Cost:
$2,432
$510 6,977 $244 17 - - $510
6,977
kWh
$244
17
kW-months/year
-
-
lb
11: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$519
Cost:
$2,033
$519 6,560 - - - - $519
6,560
kWh
-
-
kW-months/year
-
-
lb
12: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,832
Cost:
$14,632
$2,832 35,796 - - - - $2,832
35,796
kWh
-
-
kW-months/year
-
-
lb
13: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$58,477
Cost:
$704,893
$58,477 688,480 - - - - $58,477
688,480
kWh
-
-
kW-months/year
-
-
lb
14: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$123,261
Cost:
$24,000
- - - - $123,261 - -
-
kWh
-
-
kW-months/year
$123,261
-
lb
15: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$187,500
Cost:
$16,945
- - - - $187,500 - -
-
kWh
-
-
kW-months/year
$187,500
-
lb
TOTAL RECOMMENDED Savings:
$721,631
Cost:
$912,141
$324,343 4,044,241 $86,527 5,764 $310,761 - $324,343
4,044,241
kWh
$86,527
5,764
kW-months/year
$310,761
-
lb
TOTAL IMPLEMENTED Savings:
$440,697
Cost:
$789,641
$121,537 1,481,009 $8,399 560 $310,761 - $121,537
1,481,009
kWh
$8,399
560
kW-months/year
$310,761
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)