IAC logo
IAC Assessment: SF0344
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0344
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2007
Principal Product Wine
NAICS 312130 - Wineries
SIC 2084 - Wines, Brandy, And Brandy Spirits
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 73,000
Annual Production 100,000 Units
Production Hrs. Annual 1,445
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,959 660,200 kWh $0.12
Electricity Demand $22,212 2,403 kW-months/year $9.24
Electricity Fees $1,915 - $ -
LPG $33,500 1,979 MMBtu $16.93
TOTAL ENERGY COSTS $134,586
RECOMMENDED SAVINGS* $30,453 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,612
Cost:
$3,008
$9,612 83,791 - - $9,612
83,791
kWh
-
-
kW-months/year
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$335
Cost:
$352
$211 1,845 $124 14 $211
1,845
kWh
$124
14
kW-months/year
03: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$13,469
Cost:
$7,210
$10,225 89,135 $3,244 360 $10,225
89,135
kWh
$3,244
360
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,078
Cost:
$4,880
$1,556 13,565 $522 58 $1,556
13,565
kWh
$522
58
kW-months/year
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,664
Cost:
$8,663
- - $2,664 37 -
-
kWh
$2,664
37
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,295
Cost:
$15,730
$1,668 14,537 $627 70 $1,668
14,537
kWh
$627
70
kW-months/year
TOTAL RECOMMENDED Savings:
$30,453
Cost:
$39,843
$23,272 202,873 $7,181 539 $23,272
202,873
kWh
$7,181
539
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand