IAC Assessment: SF0372
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0372
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2009
Principal Product molded plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 28
Plant Area (Sq.Ft.) 12,000
Annual Production 30,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,464 714,490 kWh $0.14
Electricity Demand $8,199 2,102 kW-months/year $3.90
Electricity Fees $12,612 - $ -
Natural Gas $2,394 168 MMBtu $14.25
TOTAL ENERGY COSTS $120,669
RECOMMENDED SAVINGS* $28,764 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $707
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$707
Cost:
-
$707 7,820 - - $707
7,820
kWh
-
-
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,050
Cost:
$12,551
$8,949 65,606 $101 26 $8,949
65,606
kWh
$101
26
kW-months/year
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$545
Cost:
$789
$522 3,828 $23 6 $522
3,828
kWh
$23
6
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$765
Cost:
$1,142
$738 5,393 $27 7 $738
5,393
kWh
$27
7
kW-months/year
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,121
Cost:
$20,369
$7,121 52,201 - - $7,121
52,201
kWh
-
-
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,009
Cost:
$17,634
$4,650 34,096 $359 92 $4,650
34,096
kWh
$359
92
kW-months/year
07: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$5,567
Cost:
$24,469
$5,567 40,812 - - $5,567
40,812
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$28,764
Cost:
$76,954
$28,254 209,756 $510 131 $28,254
209,756
kWh
$510
131
kW-months/year
TOTAL IMPLEMENTED Savings:
$707
Cost:
-
$707 7,820 - - $707
7,820
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand