IAC logo
IAC Assessment: SF0377
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0377
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2009
Principal Product Railroad Waste Treatment Systems
NAICS 336510 - Railroad Rolling Stock Manufacturing
SIC 3743 - Railroad Equipment
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 70,000
Annual Production 250 Units
Production Hrs. Annual 2,210
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,732 497,680 kWh $0.11
Electricity Demand $17,199 2,466 kW-months/year $6.97
Natural Gas $41,657 3,655 MMBtu $11.40
TOTAL ENERGY COSTS $112,588
RECOMMENDED SAVINGS* $20,359 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,324
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,324
Cost:
-
$3,324 33,336 - - - - $3,324
33,336
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,657
Cost:
$1,518
$1,258 10,373 $399 50 - - $1,258
10,373
kWh
$399
50
kW-months/year
-
-
MMBtu
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,094
Cost:
$2,088
$804 6,630 $290 72 - - $804
6,630
kWh
$290
72
kW-months/year
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$209
Cost:
$587
$167 1,028 $42 5 - - $167
1,028
kWh
$42
5
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$977
Cost:
$4,281
$718 5,920 $259 32 - - $718
5,920
kWh
$259
32
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,529
Cost:
$30,407
$6,529 53,829 - - - - $6,529
53,829
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,453
Cost:
$38,867
$3,436 28,327 $1,017 126 - - $3,436
28,327
kWh
$1,017
126
kW-months/year
-
-
MMBtu
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,116
Cost:
$25,320
$1,368 11,279 $378 47 $370 33 $1,368
11,279
kWh
$378
47
kW-months/year
$370
33
MMBtu
TOTAL RECOMMENDED Savings:
$20,359
Cost:
$103,068
$17,604 150,722 $2,385 332 $370 33 $17,604
150,722
kWh
$2,385
332
kW-months/year
$370
33
MMBtu
TOTAL IMPLEMENTED Savings:
$3,324
Cost:
-
$3,324 33,336 - - - - $3,324
33,336
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas