IAC logo
IAC Assessment: SF0387
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0387
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2010
Principal Product Composition Roofing
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $5,000,000-$10,000,000
# of Employees 31
Plant Area (Sq.Ft.) 60,235
Annual Production 1 Units
Production Hrs. Annual 8,760
Location (State) ca
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,895 930,600 kWh $0.16
Natural Gas $141,866 17,346 MMBtu $8.18
TOTAL ENERGY COSTS $290,761
RECOMMENDED SAVINGS* $27,488 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,344
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,144
Cost:
-
- - $5,144 - - - -
-
kWh
$5,144
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$747
Cost:
-
$747 4,222 - - - - $747
4,222
kWh
-
-
$
-
-
MMBtu
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$7,756
Cost:
$1,353
$7,756 43,821 - - - - $7,756
43,821
kWh
-
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,874
Cost:
$1,627
$1,874 10,547 - - - - $1,874
10,547
kWh
-
-
$
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,964
Cost:
$7,727
- - - - $5,964 727 -
-
kWh
-
-
$
$5,964
727
MMBtu
06: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$791
Cost:
$1,536
- - - - $791 96 -
-
kWh
-
-
$
$791
96
MMBtu
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$397
Cost:
$798
$397 2,246 - - - - $397
2,246
kWh
-
-
$
-
-
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,393
Cost:
$2,851
$1,393 7,838 - - - - $1,393
7,838
kWh
-
-
$
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$920
Cost:
$2,132
$920 5,202 - - - - $920
5,202
kWh
-
-
$
-
-
MMBtu
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,160
Cost:
$3,840
$1,160 6,557 - - - - $1,160
6,557
kWh
-
-
$
-
-
MMBtu
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,342
Cost:
$6,259
$1,342 7,584 - - - - $1,342
7,584
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,488
Cost:
$28,123
$15,589 88,017 $5,144 - $6,755 823 $15,589
88,017
kWh
$5,144
-
$
$6,755
823
MMBtu
TOTAL IMPLEMENTED Savings:
$22,344
Cost:
$28,123
$15,589 88,017 - - $6,755 823 $15,589
88,017
kWh
-
-
$
$6,755
823
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas