IAC Assessment: SF0395
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0395
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2011
Principal Product PVC, HDPE, ABS Pipe
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 252,799
Annual Production 90,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,650,036 21,175,483 kWh $0.08
Electricity Demand $482,994 50,328 kW-months/year $9.60
TOTAL ENERGY COSTS $2,133,030
RECOMMENDED SAVINGS* $163,652 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,244
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,724
Cost:
-
$6,724 89,177 - - - - $6,724
89,177
kWh
-
-
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,312
Cost:
-
$4,312 57,182 - - - - $4,312
57,182
kWh
-
-
kW-months/year
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,795
Cost:
$4,576
$3,795 50,333 - - - - $3,795
50,333
kWh
-
-
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,313
Cost:
$7,243
$8,110 107,570 $3,203 307 - - $8,110
107,570
kWh
$3,203
307
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,833
Cost:
$5,753
$3,465 45,961 $1,368 131 - - $3,465
45,961
kWh
$1,368
131
kW-months/year
-
-
$
06: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$1,038
Cost:
$1,467
$1,038 13,763 - - - - $1,038
13,763
kWh
-
-
kW-months/year
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,112
Cost:
$6,182
$9,087 120,518 $4,025 386 - - $9,087
120,518
kWh
$4,025
386
kW-months/year
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,218
Cost:
$6,195
$2,316 30,719 $902 86 - - $2,316
30,719
kWh
$902
86
kW-months/year
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,140
Cost:
$22,037
$8,140 107,961 - - - - $8,140
107,961
kWh
-
-
kW-months/year
-
-
$
10: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$4,772
Cost:
$18,000
$3,420 45,360 $1,352 130 - - $3,420
45,360
kWh
$1,352
130
kW-months/year
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,959
Cost:
$41,361
$5,631 74,677 - - $328 - $5,631
74,677
kWh
-
-
kW-months/year
$328
-
$
12: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$96,436
Cost:
$3,735,000
$68,850 866,812 $27,586 2,088 - - $68,850
866,812
kWh
$27,586
2,088
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$163,652
Cost:
$3,847,814
$124,888 1,610,033 $38,436 3,128 $328 - $124,888
1,610,033
kWh
$38,436
3,128
kW-months/year
$328
-
$
TOTAL IMPLEMENTED Savings:
$54,244
Cost:
$60,682
$44,296 587,492 $9,948 954 - - $44,296
587,492
kWh
$9,948
954
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes