IAC logo
IAC Assessment: SF0396
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0396
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2011
Principal Product Multiwall Paper Bags
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2674 - Bags: Uncoated Paper & Multiwall
Sales $10,000,000-$50,000,000
# of Employees 101
Plant Area (Sq.Ft.) 172,000
Annual Production 17,000 Tons
Production Hrs. Annual 8,586
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $295,971 3,181,200 kWh $0.09
Electricity Demand $103,831 7,020 kW-months/year $14.79
Electricity Fees $7,696 - $ -
Natural Gas $22,931 2,841 MMBtu $8.07
TOTAL ENERGY COSTS $430,429
RECOMMENDED SAVINGS* $42,673 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,678
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,923
Cost:
-
$1,923 21,040 - - - - $1,923
21,040
kWh
-
-
kW-months/year
-
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,498
Cost:
$1,199
- - - - $1,498 - -
-
kWh
-
-
kW-months/year
$1,498
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,230
Cost:
$1,731
$2,230 24,394 - - - - $2,230
24,394
kWh
-
-
kW-months/year
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$339
Cost:
$310
$276 3,018 $63 4 - - $276
3,018
kWh
$63
4
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,645
Cost:
$7,073
$4,591 50,228 $1,054 70 - - $4,591
50,228
kWh
$1,054
70
kW-months/year
-
-
$
06: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$605
Cost:
$1,540
$605 6,623 - - - - $605
6,623
kWh
-
-
kW-months/year
-
-
$
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$4,598
Cost:
$12,809
$2,764 30,236 $1,834 122 - - $2,764
30,236
kWh
$1,834
122
kW-months/year
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,045
Cost:
$22,410
$4,724 51,684 $2,087 139 $234 - $4,724
51,684
kWh
$2,087
139
kW-months/year
$234
-
$
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$583
Cost:
$2,107
$583 6,383 - - - - $583
6,383
kWh
-
-
kW-months/year
-
-
$
10: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$5,040
Cost:
$23,228
$5,040 55,144 - - - - $5,040
55,144
kWh
-
-
kW-months/year
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,167
Cost:
$64,213
$10,708 117,159 $2,459 163 - - $10,708
117,159
kWh
$2,459
163
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$42,673
Cost:
$136,620
$33,444 365,909 $7,497 499 $1,732 - $33,444
365,909
kWh
$7,497
499
kW-months/year
$1,732
-
$
TOTAL IMPLEMENTED Savings:
$22,678
Cost:
$57,867
$17,742 194,120 $3,204 214 $1,732 - $17,742
194,120
kWh
$3,204
214
kW-months/year
$1,732
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees