IAC Assessment: SF0402
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0402
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2011
Principal Product Seals and Gaskets
NAICS 339991 - Gasket, Packing, and Sealing Device Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 100,000
Annual Production 120,000 Pounds
Production Hrs. Annual 2,470
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,637 653,760 kWh $0.10
Electricity Demand $20,916 2,326 kW-months/year $8.99
Electricity Fees $684 - $ -
Natural Gas $15,192 1,665 MMBtu $9.13
TOTAL ENERGY COSTS $100,429
RECOMMENDED SAVINGS* $16,889 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,438
Cost:
$3,737
$1,050 10,795 $388 43 - - - - - - $1,050
10,795
kWh
$388
43
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,857
Cost:
$10,811
$2,142 22,019 $788 88 - - $(-120) - $47 - $2,142
22,019
kWh
$788
88
kW-months/year
-
-
MMBtu
$(-120)
-
$
$47
-
$
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$5,402
Cost:
$23,288
$3,977 40,869 $1,470 163 - - $(-200) - $155 - $3,977
40,869
kWh
$1,470
163
kW-months/year
-
-
MMBtu
$(-200)
-
$
$155
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,789
Cost:
$29,916
$3,619 37,190 $680 76 - - $353 - $137 - $3,619
37,190
kWh
$680
76
kW-months/year
-
-
MMBtu
$353
-
$
$137
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$766
Cost:
$4,483
$797 8,190 $283 31 $(-314) (-35) - - - - $797
8,190
kWh
$283
31
kW-months/year
$(-314)
(-35)
MMBtu
-
-
$
-
-
$
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,637
Cost:
$11,070
$1,637 16,824 - - - - - - - - $1,637
16,824
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,889
Cost:
$83,305
$13,222 135,887 $3,609 401 $(-314) (-35) $33 - $339 - $13,222
135,887
kWh
$3,609
401
kW-months/year
$(-314)
(-35)
MMBtu
$33
-
$
$339
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost