IAC Assessment: SF0405
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0405
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2012
Principal Product Canned Tomatoes
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $100,000,000-$500,000,000
# of Employees 1,200
Plant Area (Sq.Ft.) 210,000
Annual Production 500,000 Tons
Production Hrs. Annual 2,016
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,606,552 15,038,592 kWh $0.11
Electricity Demand $589,821 28,668 kW-months/year $20.57
Electricity Fees $18,018 - $ -
Natural Gas $4,248,926 794,998 MMBtu $5.34
TOTAL ENERGY COSTS $6,463,317
RECOMMENDED SAVINGS* $481,789 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $241,283
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,795
Cost:
$1,200
$7,795 72,991 - - - - - - - - $7,795
72,991
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$76,949
Cost:
$36,149
- - - - $76,949 14,410 - - - - -
-
kWh
-
-
kW-months/year
$76,949
14,410
MMBtu
-
-
$
-
-
$
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$139,563
Cost:
$85,532
- - - - $139,563 26,135 - - - - -
-
kWh
-
-
kW-months/year
$139,563
26,135
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,933
Cost:
$21,797
$23,995 224,672 $3,938 191 - - - - - - $23,995
224,672
kWh
$3,938
191
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$38,824
Cost:
$39,132
- - - - $38,824 7,271 - - - - -
-
kWh
-
-
kW-months/year
$38,824
7,271
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,152
Cost:
$11,614
$5,560 52,064 $1,592 77 - - - - - - $5,560
52,064
kWh
$1,592
77
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$52,595
Cost:
$93,960
$52,595 492,466 - - - - - - - - $52,595
492,466
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,761
Cost:
$9,004
$2,251 21,073 $1,510 73 - - - - - - $2,251
21,073
kWh
$1,510
73
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$112,997
Cost:
$524,700
$99,940 935,771 $28,644 1,393 $(-15,587) (-2,919) - - - - $99,940
935,771
kWh
$28,644
1,393
kW-months/year
$(-15,587)
(-2,919)
MMBtu
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,215
Cost:
$62,332
$7,654 71,671 $2,872 140 - - $417 - $2,272 - $7,654
71,671
kWh
$2,872
140
kW-months/year
-
-
MMBtu
$417
-
$
$2,272
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,005
Cost:
$6,397
$781 7,311 $224 11 - - - - - - $781
7,311
kWh
$224
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$481,789
Cost:
$891,817
$200,571 1,878,019 $38,780 1,885 $239,749 44,897 $417 - $2,272 - $200,571
1,878,019
kWh
$38,780
1,885
kW-months/year
$239,749
44,897
MMBtu
$417
-
$
$2,272
-
$
TOTAL IMPLEMENTED Savings:
$241,283
Cost:
$194,217
$17,700 165,735 $4,382 213 $216,512 40,545 $417 - $2,272 - $17,700
165,735
kWh
$4,382
213
kW-months/year
$216,512
40,545
MMBtu
$417
-
$
$2,272
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost