IAC logo
IAC Assessment: SF0429
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0429
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2013
Principal Product Licorice Candy
NAICS 311340 - Nonchocolate Confectionery Manufacturing
SIC 2064 - Candy & Other Confectionery Products
Sales $50,000,000-$100,000,000
# of Employees 186
Plant Area (Sq.Ft.) 250,000
Annual Production 379 Pounds
Production Hrs. Annual 6,554
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $548,359 5,634,410 kWh $0.10
Electricity Demand $236,777 14,448 kW-months/year $16.39
Electricity Fees $27,154 - $ -
Natural Gas $853,717 139,785 MMBtu $6.11
TOTAL ENERGY COSTS $1,666,007
RECOMMENDED SAVINGS* $284,061 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,233
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$18,109
Cost:
-
$2,040 20,957 $679 42 - - $15,390 2,520 $2,040
20,957
kWh
$679
42
kW-months/year
-
-
$
$15,390
2,520
MMBtu
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$578
Cost:
$810
- - - - - - $578 95 -
-
kWh
-
-
kW-months/year
-
-
$
$578
95
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,006
Cost:
$16,020
$5,799 59,586 $1,207 73 - - - - $5,799
59,586
kWh
$1,207
73
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$14,210
Cost:
$38,634
$11,066 133,708 $3,144 192 - - - - $11,066
133,708
kWh
$3,144
192
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$9,736
Cost:
$36,817
$9,736 100,035 - - - - - - $9,736
100,035
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$919
Cost:
$5,601
$919 9,439 - - - - - - $919
9,439
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$4,991
Cost:
-
- - - - $4,991 - - - -
-
kWh
-
-
kW-months/year
$4,991
-
$
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$228,512
Cost:
-
- - - - - - $228,512 37,718 -
-
kWh
-
-
kW-months/year
-
-
$
$228,512
37,718
MMBtu
TOTAL RECOMMENDED Savings:
$284,061
Cost:
$97,882
$29,560 323,725 $5,030 307 $4,991 - $244,480 40,333 $29,560
323,725
kWh
$5,030
307
kW-months/year
$4,991
-
$
$244,480
40,333
MMBtu
TOTAL IMPLEMENTED Savings:
$11,233
Cost:
$43,228
$10,655 109,474 - - - - $578 95 $10,655
109,474
kWh
-
-
kW-months/year
-
-
$
$578
95
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas