IAC Assessment: SF0440
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0440
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2013
Principal Product Packaged Produce
NAICS 115114 - Postharvest Crop Activities (except Cotton Ginning)
SIC 0723 - Crop Preparation Services For Market
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 71,200
Annual Production 20,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $581,800 6,734,733 kWh $0.09
Electricity Demand $367,866 15,852 kW-months/year $23.21
Electricity Fees $15,864 - $ -
TOTAL ENERGY COSTS $1,089,018
RECOMMENDED SAVINGS* $315,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $292,955
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Ancillary Material Cost Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Water Disposal Ancillary Material Cost Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $ $ Tgal $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$212,131
Cost:
$19,224
$45,744 529,506 $18,540 799 - - $35,250 32,659,200 - - $112,597 - - - $45,744
529,506
kWh
$18,540
799
kW-months/year
-
-
$
$35,250
32,659,200
Tgal
-
-
$
$112,597
-
Tgal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,352
Cost:
$6,354
$3,137 36,309 $1,215 53 - - - - - - - - - - $3,137
36,309
kWh
$1,215
53
kW-months/year
-
-
$
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,575
Cost:
$16,520
$10,575 122,409 - - - - - - - - - - - - $10,575
122,409
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,854
Cost:
$11,795
$2,817 32,608 $1,037 44 - - - - - - - - - - $2,817
32,608
kWh
$1,037
44
kW-months/year
-
-
$
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,122
Cost:
$41,610
$7,161 82,888 $1,918 83 - - - - $584 - - - $459 - $7,161
82,888
kWh
$1,918
83
kW-months/year
-
-
$
-
-
Tgal
$584
-
$
-
-
Tgal
$459
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$40,388
Cost:
$27,000
- - - - - - - - - - - - $40,388 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
-
-
Tgal
$40,388
-
$
07: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$17,219
Cost:
$50,025
- - - - - - $4,255 3,942,000 - - $12,964 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,255
3,942,000
Tgal
-
-
$
$12,964
-
Tgal
-
-
$
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$11,533
Cost:
$66,403
- - - - - - $2,891 2,628,000 - - $8,642 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,891
2,628,000
Tgal
-
-
$
$8,642
-
Tgal
-
-
$
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$5,324
Cost:
$12,624
- - - - $5,324 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,324
-
$
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$315,498
Cost:
$251,555
$69,434 803,720 $22,710 979 $5,324 - $42,396 39,229,200 $584 - $134,203 - $40,847 - $69,434
803,720
kWh
$22,710
979
kW-months/year
$5,324
-
$
$42,396
39,229,200
Tgal
$584
-
$
$134,203
-
Tgal
$40,847
-
$
TOTAL IMPLEMENTED Savings:
$292,955
Cost:
$188,906
$69,434 803,720 $22,710 979 - - $38,141 35,287,200 $584 - $121,239 - $40,847 - $69,434
803,720
kWh
$22,710
979
kW-months/year
-
-
$
$38,141
35,287,200
Tgal
$584
-
$
$121,239
-
Tgal
$40,847
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $ $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Ancillary Material Cost Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Water Disposal Ancillary Material Cost Water Consumption One-time Revenue or Avoided Cost