IAC Assessment: SF0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2014
Principal Product Transformers
NAICS 335311 - Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612 - Transformers, Except Electronic
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 105,400
Annual Production 84 Pieces
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $397,257 3,328,517 kWh $0.12
Electricity Demand $229,436 9,480 kW-months/year $24.20
Electricity Fees $6,713 - $ -
Natural Gas $21,317 2,227 MMBtu $9.57
TOTAL ENERGY COSTS $697,293
RECOMMENDED SAVINGS* $164,526 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,318
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$6,081
Cost:
-
$6,081 65,015 - - - - - - - - $6,081
65,015
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,343
Cost:
-
$1,343 12,617 - - - - - - - - $1,343
12,617
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,894
Cost:
$68,183
$24,384 229,042 $10,493 433 - - - - $(-1,983) - $24,384
229,042
kWh
$10,493
433
kW-months/year
-
-
$
-
-
$
$(-1,983)
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$5,656
Cost:
$20,482
$3,573 33,561 $2,083 86 - - - - - - $3,573
33,561
kWh
$2,083
86
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$22,823
Cost:
-
- - - - $22,823 - - - - - -
-
kWh
-
-
kW-months/year
$22,823
-
$
-
-
$
-
-
$
06: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$67,626
Cost:
$187,500
- - - - $67,626 - - - - - -
-
kWh
-
-
kW-months/year
$67,626
-
$
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$28,103
Cost:
$27,500
- - - - - - $28,103 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$28,103
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$164,526
Cost:
$303,665
$35,381 340,235 $12,576 520 $90,449 - $28,103 - $(-1,983) - $35,381
340,235
kWh
$12,576
520
kW-months/year
$90,449
-
$
$28,103
-
$
$(-1,983)
-
$
TOTAL IMPLEMENTED Savings:
$40,318
Cost:
$68,183
$31,808 306,674 $10,493 433 - - - - $(-1,983) - $31,808
306,674
kWh
$10,493
433
kW-months/year
-
-
$
-
-
$
$(-1,983)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost