IAC Assessment: SF0468
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0468
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2015
Principal Product Investment Castings
NAICS 331410 - Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3339 - Primary Nonferrous Metals, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 72,000
Annual Production 1,200,000 Pounds
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $911,532 11,227,901 kWh $0.08
Electricity Demand $503,419 21,194 kW-months/year $23.75
Natural Gas $331,310 54,021 MMBtu $6.13
TOTAL ENERGY COSTS $1,746,261
RECOMMENDED SAVINGS* $79,943 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,257
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,541
Cost:
-
$3,541 52,476 - - - - $3,541
52,476
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$15,328
Cost:
-
- - $15,328 671 - - -
-
kWh
$15,328
671
kW-months/year
-
-
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$13,761
Cost:
-
$6,100 75,124 - - $7,661 1,250 $6,100
75,124
kWh
-
-
kW-months/year
$7,661
1,250
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,358
Cost:
$455
$2,358 28,724 - - - - $2,358
28,724
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,141
Cost:
$1,658
$5,141 63,310 - - - - $5,141
63,310
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$26,031
Cost:
$8,158
$26,031 320,573 - - - - $26,031
320,573
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$356
Cost:
$274
$356 4,379 - - - - $356
4,379
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,043
Cost:
$1,679
$1,121 13,809 $922 38 - - $1,121
13,809
kWh
$922
38
kW-months/year
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,506
Cost:
$8,348
$1,399 17,232 $107 5 - - $1,399
17,232
kWh
$107
5
kW-months/year
-
-
MMBtu
10: 2.1224 REPLACE BOILER Savings:
$9,878
Cost:
$51,914
- - - - $9,878 1,611 -
-
kWh
-
-
kW-months/year
$9,878
1,611
MMBtu
TOTAL RECOMMENDED Savings:
$79,943
Cost:
$72,486
$46,047 575,627 $16,357 715 $17,539 2,861 $46,047
575,627
kWh
$16,357
715
kW-months/year
$17,539
2,861
MMBtu
TOTAL IMPLEMENTED Savings:
$62,257
Cost:
$72,031
$43,689 546,903 $1,029 43 $17,539 2,861 $43,689
546,903
kWh
$1,029
43
kW-months/year
$17,539
2,861
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas