Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2015 |
Principal Product | Wines |
NAICS | 312130 - Wineries |
SIC | 2084 - Wines, Brandy, And Brandy Spirits |
Sales | $100,000,000-$500,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 95,000 |
Annual Production | 2,000,000 Units |
Production Hrs. Annual | 2,895 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $442,602 | 2,927,638 | kWh | $0.15 |
Natural Gas | $102,666 | 10,484 | MMBtu | $9.79 |
TOTAL ENERGY COSTS | $545,268 | |||
RECOMMENDED SAVINGS* | $160,170 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $91,025 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Natural Gas | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,699 Cost: - |
$1,699 | 11,239 | - | - | - | - | - | - |
$1,699 11,239 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,169 Cost: - |
$2,589 | 17,122 | - | - | $(-420) | - | - | - |
$2,589 17,122 kWh |
- - MMBtu |
$(-420) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $37,843 Cost: - |
$32,743 | 216,585 | $5,100 | 521 | - | - | - | - |
$32,743 216,585 kWh |
$5,100 521 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $26,501 Cost: $5,010 |
$26,501 | 175,296 | - | - | - | - | - | - |
$26,501 175,296 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $60,323 Cost: $13,006 |
$60,323 | 399,016 | - | - | - | - | - | - |
$60,323 399,016 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,400 Cost: $6,155 |
$4,400 | 29,103 | - | - | - | - | - | - |
$4,400 29,103 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,353 Cost: $39,333 |
$6,698 | 44,304 | - | - | $1,507 | - | $3,148 | - |
$6,698 44,304 kWh |
- - MMBtu |
$1,507 - $ |
$3,148 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,240 Cost: $4,506 |
$1,240 | 8,200 | - | - | - | - | - | - |
$1,240 8,200 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $7,582 Cost: $31,836 |
$7,582 | 50,153 | - | - | - | - | - | - |
$7,582 50,153 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $7,060 Cost: $29,463 |
$7,060 | 46,701 | - | - | - | - | - | - |
$7,060 46,701 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $160,170 Cost: $129,309 |
$150,835 | 997,719 | $5,100 | 521 | $1,087 | - | $3,148 | - | $150,835 997,719 kWh |
$5,100 521 MMBtu |
$1,087 - $ |
$3,148 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $91,025 Cost: $79,961 |
$81,690 | 540,350 | $5,100 | 521 | $1,087 | - | $3,148 | - | $81,690 540,350 kWh |
$5,100 521 MMBtu |
$1,087 - $ |
$3,148 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Natural Gas | Personnel Changes | Primary Raw Material |