IAC logo
IAC Assessment: SF0478
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0478
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2016
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 300,000
Annual Production 2,900,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $570,896 6,755,363 kWh $0.08
Electricity Demand $303,459 12,849 kW-months/year $23.62
Natural Gas $4,508 463 MMBtu $9.74
TOTAL ENERGY COSTS $878,864
RECOMMENDED SAVINGS* $396,584 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $392,628
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$5,976
Cost:
-
- - - - $5,976 - - - - - - - -
-
kWh
-
-
kW-months/year
$5,976
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$6,324
Cost:
$2,354
$6,324 74,837 - - - - - - - - - - $6,324
74,837
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,559
Cost:
$6,856
$9,028 106,831 $3,531 150 - - - - - - - - $9,028
106,831
kWh
$3,531
150
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$3,956
Cost:
$2,003
$3,956 46,810 - - - - - - - - - - $3,956
46,810
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$18,801
Cost:
$20,415
$17,201 203,537 $1,600 68 - - - - - - - - $17,201
203,537
kWh
$1,600
68
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,062
Cost:
$48,543
$19,489 230,609 $5,591 237 - - - - $2,519 - $(-2,537) - $19,489
230,609
kWh
$5,591
237
kW-months/year
-
-
$
-
-
MMBtu
$2,519
-
$
$(-2,537)
-
$
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$323,906
Cost:
$1,095,380
$405,790 4,801,680 $155,892 6,600 - - $(-78,224) (-14,459) $(-159,552) - - - $405,790
4,801,680
kWh
$155,892
6,600
kW-months/year
-
-
$
$(-78,224)
(-14,459)
MMBtu
$(-159,552)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$396,584
Cost:
$1,175,551
$461,788 5,464,304 $166,614 7,054 $5,976 - $(-78,224) (-14,459) $(-157,033) - $(-2,537) - $461,788
5,464,304
kWh
$166,614
7,054
kW-months/year
$5,976
-
$
$(-78,224)
(-14,459)
MMBtu
$(-157,033)
-
$
$(-2,537)
-
$
TOTAL IMPLEMENTED Savings:
$392,628
Cost:
$1,173,548
$457,832 5,417,494 $166,614 7,054 $5,976 - $(-78,224) (-14,459) $(-157,033) - $(-2,537) - $457,832
5,417,494
kWh
$166,614
7,054
kW-months/year
$5,976
-
$
$(-78,224)
(-14,459)
MMBtu
$(-157,033)
-
$
$(-2,537)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost