IAC logo
IAC Assessment: SF0480
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0480
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2016
Principal Product Processed almonds
NAICS 115114 - Postharvest Crop Activities (except Cotton Ginning)
SIC 0723 - Crop Preparation Services For Market
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 85,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 4,096
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,273 1,386,317 kWh $0.10
Electricity Demand $82,728 5,514 kW-months/year $15.00
TOTAL ENERGY COSTS $219,001
RECOMMENDED SAVINGS* $129,754 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $111,903
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$2,228
Cost:
-
$1,186 12,061 $1,042 69 - - - - $1,186
12,061
kWh
$1,042
69
kW-months/year
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$187
Cost:
-
$187 1,905 - - - - - - $187
1,905
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,403
Cost:
$354
$3,734 37,985 $1,669 112 - - - - $3,734
37,985
kWh
$1,669
112
kW-months/year
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,097
Cost:
$219
$867 8,819 $230 15 - - - - $867
8,819
kWh
$230
15
kW-months/year
-
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$6,005
Cost:
$4,163
$6,005 61,086 - - - - - - $6,005
61,086
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,322
Cost:
$10,120
$4,207 42,799 $1,115 74 - - - - $4,207
42,799
kWh
$1,115
74
kW-months/year
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,524
Cost:
$22,649
$4,281 43,546 $2,557 170 $282 - $(-596) - $4,281
43,546
kWh
$2,557
170
kW-months/year
$282
-
$
$(-596)
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,041
Cost:
$31,062
$3,425 34,845 $2,616 178 - - - - $3,425
34,845
kWh
$2,616
178
kW-months/year
-
-
$
-
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$96,947
Cost:
$904,867
$69,313 705,121 $27,634 1,848 - - - - $69,313
705,121
kWh
$27,634
1,848
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$129,754
Cost:
$973,434
$93,205 948,167 $36,863 2,467 $282 - $(-596) - $93,205
948,167
kWh
$36,863
2,467
kW-months/year
$282
-
$
$(-596)
-
$
TOTAL IMPLEMENTED Savings:
$111,903
Cost:
$936,502
$78,712 800,736 $33,191 2,222 - - - - $78,712
800,736
kWh
$33,191
2,222
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost