Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2016 |
Principal Product | Non-Carbonated Beverages |
NAICS | 311421 - Fruit and Vegetable Canning |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 192 |
Plant Area (Sq.Ft.) | 387,000 |
Annual Production | 47,000 Units |
Production Hrs. Annual | 7,248 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $647,031 | 5,997,816 | kWh | $0.11 |
Electricity Demand | $552,243 | 18,864 | kW-months/year | $29.27 |
Natural Gas | $778,045 | 140,333 | MMBtu | $5.54 |
Other Energy | $748,172 | 5,282,671 | MMBtu | $0.14 |
TOTAL ENERGY COSTS | $2,725,491 | |||
RECOMMENDED SAVINGS* | $247,116 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $81,221 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,477 Cost: $140 |
$3,089 | 28,637 | $1,388 | 47 | - | - | - | - | - | - | - | - |
$3,089 28,637 kWh |
$1,388 47 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $10,662 Cost: - |
- | - | - | - | $10,662 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,662 - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $16,033 Cost: - |
$9,576 | 88,767 | - | - | - | - | $6,457 | 1,166 | - | - | - | - |
$9,576 88,767 kWh |
- - kW-months/year |
- - $ |
$6,457 1,166 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $5,008 Cost: - |
- | - | - | - | - | - | $10,008 | 1,807 | $(-5,000) | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$10,008 1,807 MMBtu |
$(-5,000) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $23,373 Cost: - |
$23,373 | 216,661 | - | - | - | - | - | - | - | - | - | - |
$23,373 216,661 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $908 Cost: $105 |
$328 | 3,044 | $148 | 5 | - | - | - | - | $19 | - | $413 | - |
$328 3,044 kWh |
$148 5 kW-months/year |
- - $ |
- - MMBtu |
$19 - $ |
$413 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,030 Cost: $208 |
$716 | 6,635 | $314 | 11 | - | - | - | - | - | - | - | - |
$716 6,635 kWh |
$314 11 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER |
Savings: $119,304 Cost: $36,151 |
$82,947 | 768,886 | $36,357 | 1,242 | - | - | - | - | - | - | - | - |
$82,947 768,886 kWh |
$36,357 1,242 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $48,481 Cost: $18,682 |
$48,481 | 449,401 | - | - | - | - | - | - | - | - | - | - |
$48,481 449,401 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $660 Cost: $769 |
- | - | - | - | - | - | $660 | 119 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$660 119 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $7,601 Cost: $10,000 |
- | - | - | - | - | - | $7,601 | 1,372 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$7,601 1,372 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,674 Cost: $10,567 |
$4,640 | 43,012 | $2,034 | 69 | - | - | - | - | - | - | - | - |
$4,640 43,012 kWh |
$2,034 69 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $2,905 Cost: $11,333 |
- | - | - | - | - | - | $2,905 | 524 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,905 524 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $247,116 Cost: $87,955 |
$173,150 | 1,605,043 | $40,241 | 1,375 | $10,662 | - | $27,631 | 4,988 | $(-4,981) | - | $413 | - | $173,150 1,605,043 kWh |
$40,241 1,375 kW-months/year |
$10,662 - $ |
$27,631 4,988 MMBtu |
$(-4,981) - $ |
$413 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $81,221 Cost: $19,696 |
$61,474 | 569,849 | $1,536 | 52 | $10,662 | - | $7,117 | 1,285 | $19 | - | $413 | - | $61,474 569,849 kWh |
$1,536 52 kW-months/year |
$10,662 - $ |
$7,117 1,285 MMBtu |
$19 - $ |
$413 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost |