IAC Assessment: SF0494
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0494
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2016
Principal Product Wine
NAICS 312130 - Wineries
SIC 2084 - Wines, Brandy, And Brandy Spirits
Sales $5,000,000-$10,000,000
# of Employees 11
Plant Area (Sq.Ft.) 60,000
Annual Production 630 Thousand Gallons
Production Hrs. Annual 3,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,768 418,691 kWh $0.14
Electricity Demand $35,974 2,426 kW-months/year $14.83
Natural Gas $14,340 1,627 MMBtu $8.82
TOTAL ENERGY COSTS $109,082
RECOMMENDED SAVINGS* $63,557 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,064
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,238
Cost:
-
- - - - $2,238 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,238
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$270
Cost:
-
$340 2,425 - - - - - - $(-70) - - - - - $340
2,425
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-70)
-
$
-
-
$
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,772
Cost:
$2,510
$2,923 20,825 - - - - $2,849 323 - - - - - - $2,923
20,825
kWh
-
-
kW-months/year
-
-
$
$2,849
323
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,469
Cost:
$4,948
$1,362 9,702 $846 57 - - - - - - $137 - $124 - $1,362
9,702
kWh
$846
57
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$137
-
$
$124
-
$
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,493
Cost:
$5,050
$1,493 10,635 - - - - - - - - - - - - $1,493
10,635
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$567
Cost:
$2,381
$309 2,201 $258 17 - - - - - - - - - - $309
2,201
kWh
$258
17
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$50,748
Cost:
$406,834
$36,734 261,715 $14,014 945 - - - - - - - - - - $36,734
261,715
kWh
$14,014
945
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$63,557
Cost:
$421,723
$43,161 307,503 $15,118 1,019 $2,238 - $2,849 323 $(-70) - $137 - $124 - $43,161
307,503
kWh
$15,118
1,019
kW-months/year
$2,238
-
$
$2,849
323
MMBtu
$(-70)
-
$
$137
-
$
$124
-
$
TOTAL IMPLEMENTED Savings:
$62,064
Cost:
$416,673
$41,668 296,868 $15,118 1,019 $2,238 - $2,849 323 $(-70) - $137 - $124 - $41,668
296,868
kWh
$15,118
1,019
kW-months/year
$2,238
-
$
$2,849
323
MMBtu
$(-70)
-
$
$137
-
$
$124
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost