IAC logo
IAC Assessment: SF0495
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0495
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2016
Principal Product Baked Goods
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 16,000
Annual Production 5,000,000 Units
Production Hrs. Annual 5,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,414 750,715 kWh $0.13
Electricity Demand $43,322 1,584 kW-months/year $27.35
Electricity Fees $26,227 - $ -
Natural Gas $49,935 5,013 MMBtu $9.96
TOTAL ENERGY COSTS $214,898
RECOMMENDED SAVINGS* $20,285 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,614
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,207
Cost:
$661
- - $1,207 164 - - - - -
-
kWh
$1,207
164
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,370
Cost:
$6,127
$6,879 54,123 $2,408 88 $467 - $(-384) - $6,879
54,123
kWh
$2,408
88
kW-months/year
$467
-
$
$(-384)
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,562
Cost:
$3,136
$2,562 20,155 - - - - - - $2,562
20,155
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,447
Cost:
$8,329
$3,447 27,120 - - - - - - $3,447
27,120
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,590
Cost:
$6,532
$2,022 15,912 $568 20 - - - - $2,022
15,912
kWh
$568
20
kW-months/year
-
-
$
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,109
Cost:
-
$134 4,163 $975 106 - - - - $134
4,163
kWh
$975
106
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$20,285
Cost:
$24,785
$15,044 121,473 $5,158 378 $467 - $(-384) - $15,044
121,473
kWh
$5,158
378
kW-months/year
$467
-
$
$(-384)
-
$
TOTAL IMPLEMENTED Savings:
$16,614
Cost:
$21,649
$12,348 97,155 $4,183 272 $467 - $(-384) - $12,348
97,155
kWh
$4,183
272
kW-months/year
$467
-
$
$(-384)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost