Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2018 |
Principal Product | Treated Wastewater |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4952 - Sewerage Systems |
Sales | $1,000,000-$5,000,000 |
# of Employees | 14 |
Plant Area (Sq.Ft.) | 13,372,920 |
Annual Production | 1,328,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $131,015 | 787,512 | kWh | $0.17 |
Natural Gas | $19,663 | 1,710 | MMBtu | $11.50 |
TOTAL ENERGY COSTS | $150,678 | |||
RECOMMENDED SAVINGS* | $278,388 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $278,104 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $7,086 Cost: $200 |
$7,086 | 42,595 | - | - | - | - | - | - |
$7,086 42,595 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT |
Savings: $284 Cost: $100 |
$284 | 1,704 | - | - | - | - | - | - |
$284 1,704 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,563 Cost: $803 |
- | - | $1,563 | 136 | - | - | - | - |
- - kWh |
$1,563 136 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,262 Cost: $6,590 |
$6,262 | 36,938 | - | - | - | - | - | - |
$6,262 36,938 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL |
Savings: $14,634 Cost: $50,965 |
- | - | $14,634 | 1,263 | - | - | - | - |
- - kWh |
$14,634 1,263 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $47,532 Cost: $293,579 |
$119,828 | 720,252 | $(-15,187) | (-2,879) | $(-19,951) | - | $(-37,158) | - |
$119,828 720,252 kWh |
$(-15,187) (-2,879) MMBtu |
$(-19,951) - $ |
$(-37,158) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $201,027 Cost: $1,738,526 |
$201,027 | 1,208,310 | - | - | - | - | - | - |
$201,027 1,208,310 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $278,388 Cost: $2,090,763 |
$334,487 | 2,009,799 | $1,010 | (-1,480) | $(-19,951) | - | $(-37,158) | - | $334,487 2,009,799 kWh |
$1,010 (-1,480) MMBtu |
$(-19,951) - $ |
$(-37,158) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $278,104 Cost: $2,090,663 |
$334,203 | 2,008,095 | $1,010 | (-1,480) | $(-19,951) | - | $(-37,158) | - | $334,203 2,008,095 kWh |
$1,010 (-1,480) MMBtu |
$(-19,951) - $ |
$(-37,158) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes |