IAC Assessment: SF0528
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0528
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2018
Principal Product Electronics Chemical Manufacturing
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 100 Thousand Gallons
Production Hrs. Annual 4,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $772,825 8,209,597 kWh $0.09
Electricity Demand $407,779 14,196 kW-months/year $28.72
Natural Gas $268,265 29,195 MMBtu $9.19
TOTAL ENERGY COSTS $1,448,869
RECOMMENDED SAVINGS* $29,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,330
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,402
Cost:
$11,547
$7,335 77,921 $3,067 107 - - - - - - $7,335
77,921
kWh
$3,067
107
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,330
Cost:
$22,874
$6,666 70,808 $4,218 147 - - $467 - $(-21) - $6,666
70,808
kWh
$4,218
147
kW-months/year
-
-
MMBtu
$467
-
$
$(-21)
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,178
Cost:
$27,403
$8,164 86,724 $3,413 119 $(-3,399) (-370) - - - - $8,164
86,724
kWh
$3,413
119
kW-months/year
$(-3,399)
(-370)
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,910
Cost:
$61,824
$22,165 235,453 $10,698 372 $(-3,399) (-370) $467 - $(-21) - $22,165
235,453
kWh
$10,698
372
kW-months/year
$(-3,399)
(-370)
MMBtu
$467
-
$
$(-21)
-
$
TOTAL IMPLEMENTED Savings:
$11,330
Cost:
$22,874
$6,666 70,808 $4,218 147 - - $467 - $(-21) - $6,666
70,808
kWh
$4,218
147
kW-months/year
-
-
MMBtu
$467
-
$
$(-21)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost