Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2019
Principal Product Treated Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales <$500,000
# of Employees 24
Plant Area (Sq.Ft.) 35,000
Annual Production 830,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,252 1,495,796 kWh $0.11
Electricity Demand $237,141 17,505 kW-months/year $13.55
TOTAL ENERGY COSTS $398,393
RECOMMENDED SAVINGS* $133,466 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,147
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,886
Cost:
-
- - - - $1,886 - - - - - -
-
kWh
-
-
kW-months/year
$1,886
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,261
Cost:
$16,688
$4,861 41,377 - - - - $475 - $(-75) - $4,861
41,377
kWh
-
-
kW-months/year
-
-
$
$475
-
$
$(-75)
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$47,766
Cost:
$327,497
$47,766 473,684 - - - - - - - - $47,766
473,684
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$78,553
Cost:
$677,569
$64,976 538,746 $13,577 1,152 - - - - - - $64,976
538,746
kWh
$13,577
1,152
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$133,466
Cost:
$1,021,754
$117,603 1,053,807 $13,577 1,152 $1,886 - $475 - $(-75) - $117,603
1,053,807
kWh
$13,577
1,152
kW-months/year
$1,886
-
$
$475
-
$
$(-75)
-
$
TOTAL IMPLEMENTED Savings:
$7,147
Cost:
$16,688
$4,861 41,377 - - $1,886 - $475 - $(-75) - $4,861
41,377
kWh
-
-
kW-months/year
$1,886
-
$
$475
-
$
$(-75)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost