IAC logo
IAC Assessment: SF0537
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0537
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2019
Principal Product Treated Water and Recycled Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 280
Plant Area (Sq.Ft.) 10,500,000
Annual Production 11,680,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $315,672 1,817,776 kWh $0.17
Electricity Demand $443,554 20,784 kW-months/year $21.34
Natural Gas $2,008,193 420,535 MMBtu $4.78
TOTAL ENERGY COSTS $2,767,419
RECOMMENDED SAVINGS* $287,489 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $111,927
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$14,931
Cost:
$378
$14,931 85,976 - - - - - - - - $14,931
85,976
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$14,708
Cost:
$260
$13,224 76,144 $1,484 70 - - - - - - $13,224
76,144
kWh
$1,484
70
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$94,349
Cost:
$10,000
$84,830 488,455 $9,519 446 - - - - - - $84,830
488,455
kWh
$9,519
446
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,414
Cost:
$648
$5,414 31,172 - - - - - - - - $5,414
31,172
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$24,937
Cost:
$5,000
$22,421 129,099 $2,516 118 - - - - - - $22,421
129,099
kWh
$2,516
118
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,025
Cost:
$5,039
$12,025 69,239 - - - - - - - - $12,025
69,239
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$2,238
Cost:
$3,000
- - $2,238 104 - - - - - - -
-
kWh
$2,238
104
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$77,542
Cost:
$235,055
$61,354 353,280 $8,346 391 - - $6,540 - $1,302 - $61,354
353,280
kWh
$8,346
391
kW-months/year
-
-
MMBtu
$6,540
-
$
$1,302
-
$
09: 2.2126 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) Savings:
$41,345
Cost:
$175,000
$47,131 271,385 $5,289 248 $(-11,075) (-2,317) - - - - $47,131
271,385
kWh
$5,289
248
kW-months/year
$(-11,075)
(-2,317)
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$287,489
Cost:
$434,380
$261,330 1,504,750 $29,392 1,377 $(-11,075) (-2,317) $6,540 - $1,302 - $261,330
1,504,750
kWh
$29,392
1,377
kW-months/year
$(-11,075)
(-2,317)
MMBtu
$6,540
-
$
$1,302
-
$
TOTAL IMPLEMENTED Savings:
$111,927
Cost:
$244,002
$92,017 529,835 $12,068 565 - - $6,540 - $1,302 - $92,017
529,835
kWh
$12,068
565
kW-months/year
-
-
MMBtu
$6,540
-
$
$1,302
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost