IAC logo
IAC Assessment: SF0540
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0540
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2019
Principal Product Print
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 130,000
Annual Production 312,000 Pounds
Production Hrs. Annual 5,140
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,707 2,015,832 kWh $0.13
Electricity Demand $248,182 7,464 kW-months/year $33.25
Natural Gas $22,744 1,985 MMBtu $11.46
TOTAL ENERGY COSTS $532,633
RECOMMENDED SAVINGS* $124,008 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,689
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$3,623
Cost:
-
$1,463 11,269 $2,160 65 - - - - $1,463
11,269
kWh
$2,160
65
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,827
Cost:
-
$4,167 32,098 - - $(-2,340) - - - $4,167
32,098
kWh
-
-
kW-months/year
$(-2,340)
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,339
Cost:
$325
$991 7,636 $348 10 - - - - $991
7,636
kWh
$348
10
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,918
Cost:
$19,682
$5,501 42,372 $5,184 156 $496 - $(-263) - $5,501
42,372
kWh
$5,184
156
kW-months/year
$496
-
$
$(-263)
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$242
Cost:
$688
$242 1,863 - - - - - - $242
1,863
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,740
Cost:
$21,083
$3,877 29,865 $2,863 86 - - - - $3,877
29,865
kWh
$2,863
86
kW-months/year
-
-
$
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$99,319
Cost:
$402,121
$60,438 465,516 $38,881 1,176 - - - - $60,438
465,516
kWh
$38,881
1,176
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$124,008
Cost:
$443,899
$76,679 590,619 $49,436 1,493 $(-1,844) - $(-263) - $76,679
590,619
kWh
$49,436
1,493
kW-months/year
$(-1,844)
-
$
$(-263)
-
$
TOTAL IMPLEMENTED Savings:
$24,689
Cost:
$41,778
$16,241 125,103 $10,555 317 $(-1,844) - $(-263) - $16,241
125,103
kWh
$10,555
317
kW-months/year
$(-1,844)
-
$
$(-263)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost