IAC logo
IAC Assessment: SF0552
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0552
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2020
Principal Product In-shell Almonds, Raw Almonds, Almond Oil and Almond Powder
NAICS 311911 - Roasted Nuts and Peanut Butter Manufacturing
SIC 2068 - Salted And Roasted Nuts And Seeds
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 100,000
Annual Production 9,000,000 Pounds
Production Hrs. Annual 4,480
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,741 1,347,499 kWh $0.10
Electricity Demand $125,510 5,628 kW-months/year $22.30
Natural Gas $4,017 280 MMBtu $14.35
TOTAL ENERGY COSTS $269,268
RECOMMENDED SAVINGS* $146,492 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $111,131
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$25,284
Cost:
-
- - $25,284 1,134 - - - - - - -
-
kWh
$25,284
1,134
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,516
Cost:
-
$4,596 44,324 - - - - $(-1,080) - - - $4,596
44,324
kWh
-
-
kW-months/year
-
-
MMBtu
$(-1,080)
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$575
Cost:
$137
$95 915 $480 22 - - - - - - $95
915
kWh
$480
22
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$896
Cost:
$400
$896 6,282 - - - - - - - - $896
6,282
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,065
Cost:
$1,862
- - $2,065 93 - - - - - - -
-
kWh
$2,065
93
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,077
Cost:
$12,392
$7,225 69,677 $7,111 319 $(-4,259) (-297) - - - - $7,225
69,677
kWh
$7,111
319
kW-months/year
$(-4,259)
(-297)
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,621
Cost:
$33,085
$6,878 66,034 $5,712 256 - - $739 - $2,292 - $6,878
66,034
kWh
$5,712
256
kW-months/year
-
-
MMBtu
$739
-
$
$2,292
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$88,458
Cost:
$451,750
$58,025 559,550 $30,433 1,365 - - - - - - $58,025
559,550
kWh
$30,433
1,365
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$146,492
Cost:
$499,626
$77,715 746,782 $71,085 3,189 $(-4,259) (-297) $(-341) - $2,292 - $77,715
746,782
kWh
$71,085
3,189
kW-months/year
$(-4,259)
(-297)
MMBtu
$(-341)
-
$
$2,292
-
$
TOTAL IMPLEMENTED Savings:
$111,131
Cost:
$487,234
$70,490 677,105 $38,690 1,736 - - $(-341) - $2,292 - $70,490
677,105
kWh
$38,690
1,736
kW-months/year
-
-
MMBtu
$(-341)
-
$
$2,292
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material