IAC Assessment: SF0554
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0554
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2020
Principal Product Frozen Bell Peppers
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 150,000
Annual Production 90,000,000 Pounds
Production Hrs. Annual 1,792
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $601,230 8,157,700 kWh $0.07
Electricity Demand $340,736 19,164 kW-months/year $17.78
Natural Gas $109,671 14,329 MMBtu $7.65
TOTAL ENERGY COSTS $1,051,637
RECOMMENDED SAVINGS* $43,420 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,380
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$427
Cost:
$80
$310 4,201 $117 7 - - - - - - $310
4,201
kWh
$117
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2192 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS Savings:
$21,879
Cost:
$20,311
- - - - $21,879 2,860 - - - - -
-
kWh
-
-
kW-months/year
$21,879
2,860
MMBtu
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$386
Cost:
$404
- - - - $386 50 - - - - -
-
kWh
-
-
kW-months/year
$386
50
MMBtu
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,802
Cost:
$5,638
$4,802 65,149 - - - - - - - - $4,802
65,149
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,099
Cost:
$13,511
$6,538 88,710 $3,219 181 - - $260 - $82 - $6,538
88,710
kWh
$3,219
181
kW-months/year
-
-
MMBtu
$260
-
$
$82
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,140
Cost:
$1,577
- - - - $1,140 149 - - - - -
-
kWh
-
-
kW-months/year
$1,140
149
MMBtu
-
-
$
-
-
$
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$871
Cost:
$1,184
- - $871 49 - - - - - - -
-
kWh
$871
49
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$833
Cost:
$1,245
$833 11,303 - - - - - - - - $833
11,303
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$632
Cost:
$1,312
$411 5,573 $221 12 - - - - - - $411
5,573
kWh
$221
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,351
Cost:
$5,888
$2,351 31,894 - - - - - - - - $2,351
31,894
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$43,420
Cost:
$51,150
$15,245 206,830 $4,428 249 $23,405 3,059 $260 - $82 - $15,245
206,830
kWh
$4,428
249
kW-months/year
$23,405
3,059
MMBtu
$260
-
$
$82
-
$
TOTAL IMPLEMENTED Savings:
$14,380
Cost:
$21,975
$9,610 130,378 $4,428 249 - - $260 - $82 - $9,610
130,378
kWh
$4,428
249
kW-months/year
-
-
MMBtu
$260
-
$
$82
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost