IAC logo
IAC Assessment: SF0556
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0556
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2020
Principal Product in shell walnuts, shelled walnuts
NAICS 311911 - Roasted Nuts and Peanut Butter Manufacturing
SIC 2068 - Salted And Roasted Nuts And Seeds
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 35,000
Annual Production 9,620 Tons
Production Hrs. Annual 3,848
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,948 515,921 kWh $0.12
Electricity Demand $34,022 1,667 kW-months/year $20.41
TOTAL ENERGY COSTS $96,970
RECOMMENDED SAVINGS* $94,426 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $92,176
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,802
Cost:
-
$2,342 19,192 - - $(-540) - - - $2,342
19,192
kWh
-
-
kW-months/year
$(-540)
-
$
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,683
Cost:
$575
$4,683 38,385 - - - - - - $4,683
38,385
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$959
Cost:
$60
$780 6,397 $179 9 - - - - $780
6,397
kWh
$179
9
kW-months/year
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,769
Cost:
$2,289
$10,769 65,788 - - - - - - $10,769
65,788
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,729
Cost:
$864
$1,729 14,169 - - - - - - $1,729
14,169
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,238
Cost:
$5,536
$4,113 33,754 $1,125 55 - - - - $4,113
33,754
kWh
$1,125
55
kW-months/year
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,455
Cost:
$3,366
$1,928 15,801 $527 26 - - - - $1,928
15,801
kWh
$527
26
kW-months/year
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,676
Cost:
$16,092
$4,924 40,354 $1,462 72 $164 - $126 - $4,924
40,354
kWh
$1,462
72
kW-months/year
$164
-
$
$126
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$57,865
Cost:
$348,493
$51,859 425,041 $6,006 294 - - - - $51,859
425,041
kWh
$6,006
294
kW-months/year
-
-
$
-
-
$
10: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,250
Cost:
$1,064
- - $2,250 110 - - - - -
-
kWh
$2,250
110
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$94,426
Cost:
$378,339
$83,127 658,881 $11,549 566 $(-376) - $126 - $83,127
658,881
kWh
$11,549
566
kW-months/year
$(-376)
-
$
$126
-
$
TOTAL IMPLEMENTED Savings:
$92,176
Cost:
$377,275
$83,127 658,881 $9,299 456 $(-376) - $126 - $83,127
658,881
kWh
$9,299
456
kW-months/year
$(-376)
-
$
$126
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product