IAC Assessment: SF0564
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0564
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2021
Principal Product Treated Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $50,000,000-$100,000,000
# of Employees 46
Plant Area (Sq.Ft.) 290,000
Annual Production 4,929,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,334 959,776 kWh $0.12
Electricity Demand $336,402 10,512 kW-months/year $32.00
Natural Gas $262,424 44,087 MMBtu $5.95
Fuel Oil #1 $128 5 MMBtu $25.60
TOTAL ENERGY COSTS $710,288
RECOMMENDED SAVINGS* $1,079,155 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,027
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,530
Cost:
-
$12 3,564 $2,518 186 - - - - - - - - $12
3,564
kWh
$2,518
186
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$8,683
Cost:
$748
$8,683 74,854 - - - - - - - - - - $8,683
74,854
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,060
Cost:
$149
$1,060 9,139 - - - - - - - - - - $1,060
9,139
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$192,090
Cost:
$88,600
$131,859 1,136,717 $60,231 1,884 - - - - - - - - $131,859
1,136,717
kWh
$60,231
1,884
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$33,128
Cost:
$15,421
$33,128 285,589 - - - - - - - - - - $33,128
285,589
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.3323 INSTALL EMISSIONS CONTROLS TO INCREASE CAPACITY Savings:
$352,407
Cost:
$278,000
$280,667 2,419,545 $71,740 2,244 - - - - - - - - $280,667
2,419,545
kWh
$71,740
2,244
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,296
Cost:
$18,341
$24,296 209,454 - - - - - - - - - - $24,296
209,454
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$77,855
Cost:
$69,051
$77,855 671,169 - - - - - - - - - - $77,855
671,169
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$78,185
Cost:
$114,380
$55,615 479,442 $22,570 706 - - - - - - - - $55,615
479,442
kWh
$22,570
706
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
10: 2.3142 USER BATTERY STORAGE FOR POWER QUALITY ISSUES Savings:
$262,606
Cost:
$452,925
- - $291,950 9,132 $(-22,344) (-3,754) $(-7,000) (-274) - - - - -
-
kWh
$291,950
9,132
kW-months/year
$(-22,344)
(-3,754)
MMBtu
$(-7,000)
(-274)
MMBtu
-
-
$
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,256
Cost:
$50,039
$19,042 163,089 $5,393 169 - - - - $1,279 - $542 - $19,042
163,089
kWh
$5,393
169
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,279
-
$
$542
-
$
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,006
Cost:
$31,025
$9,006 77,635 - - - - - - - - - - $9,006
77,635
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,053
Cost:
$65,832
$11,053 95,287 - - - - - - - - - - $11,053
95,287
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,079,155
Cost:
$1,184,511
$652,276 5,625,484 $454,402 14,321 $(-22,344) (-3,754) $(-7,000) (-274) $1,279 - $542 - $652,276
5,625,484
kWh
$454,402
14,321
kW-months/year
$(-22,344)
(-3,754)
MMBtu
$(-7,000)
(-274)
MMBtu
$1,279
-
$
$542
-
$
TOTAL IMPLEMENTED Savings:
$74,027
Cost:
$131,441
$64,295 556,668 $7,911 355 - - - - $1,279 - $542 - $64,295
556,668
kWh
$7,911
355
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,279
-
$
$542
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Ancillary Material Cost