IAC Assessment: SF0591
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0591
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2022
Principal Product Peaches, Strawberries
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 850,000
Annual Production 67,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,155,539 29,682,000 kWh $0.07
Electricity Demand $615,372 60,966 kW-months/year $10.09
Electricity Fees $91,059 - $ -
Natural Gas $264,706 32,519 MMBtu $8.14
TOTAL ENERGY COSTS $3,126,676
RECOMMENDED SAVINGS* $153,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,945
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,537
Cost:
-
$2,617 35,033 - - - - $(-1,080) - - - $2,617
35,033
kWh
-
-
kW-months/year
-
-
MMBtu
$(-1,080)
-
$
-
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$9,922
Cost:
-
$8,017 107,320 $1,905 184 - - - - - - $8,017
107,320
kWh
$1,905
184
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$9,616
Cost:
-
- - - - $9,616 1,181 - - - - -
-
kWh
-
-
kW-months/year
$9,616
1,181
MMBtu
-
-
$
-
-
$
04: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$6,698
Cost:
-
$6,698 89,681 - - - - - - - - $6,698
89,681
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$814
Cost:
$268
$684 9,158 $130 13 - - - - - - $684
9,158
kWh
$130
13
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$22,648
Cost:
$6,467
$5,236 70,108 - - $17,412 2,139 - - - - $5,236
70,108
kWh
-
-
kW-months/year
$17,412
2,139
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,540
Cost:
$14,724
$8,954 119,878 $2,415 233 - - $313 - $(-142) - $8,954
119,878
kWh
$2,415
233
kW-months/year
-
-
MMBtu
$313
-
$
$(-142)
-
$
08: 2.2123 INSULATE FEEDWATER TANK Savings:
$1,806
Cost:
$4,445
- - - - $1,806 222 - - - - -
-
kWh
-
-
kW-months/year
$1,806
222
MMBtu
-
-
$
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,521
Cost:
$18,051
$5,521 73,912 - - - - - - - - $5,521
73,912
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$47,418
Cost:
$177,700
$47,418 634,886 - - - - - - - - $47,418
634,886
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$35,700
Cost:
$132,000
- - - - - - - - $35,700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$35,700
-
$
TOTAL RECOMMENDED Savings:
$153,220
Cost:
$353,655
$85,145 1,139,976 $4,450 429 $28,834 3,542 $(-767) - $35,558 - $85,145
1,139,976
kWh
$4,450
429
kW-months/year
$28,834
3,542
MMBtu
$(-767)
-
$
$35,558
-
$
TOTAL IMPLEMENTED Savings:
$65,945
Cost:
$39,242
$34,426 460,899 $4,320 416 $27,028 3,320 $313 - $(-142) - $34,426
460,899
kWh
$4,320
416
kW-months/year
$27,028
3,320
MMBtu
$313
-
$
$(-142)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost