IAC logo
IAC Assessment: SF0594
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0594
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2023
Principal Product Chili, Garlic and Onion Powder
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 500,000
Annual Production 12,500,000 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $844,553 7,071,893 kWh $0.12
Electricity Demand $185,985 15,816 kW-months/year $11.76
Natural Gas $78,410 6,170 MMBtu $12.71
TOTAL ENERGY COSTS $1,108,948
RECOMMENDED SAVINGS* $145,997 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,580
Cost:
-
- - $10,580 901 - - - - - - -
-
kWh
$10,580
901
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$10,143
Cost:
-
$10,143 84,946 - - - - - - - - $10,143
84,946
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$38,807
Cost:
$8,920
$12,759 106,862 - - $26,048 2,051 - - - - $12,759
106,862
kWh
-
-
kW-months/year
$26,048
2,051
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$54,583
Cost:
$28,593
$45,898 384,410 $8,685 739 - - - - - - $45,898
384,410
kWh
$8,685
739
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,223
Cost:
$4,344
$5,955 49,875 $1,268 108 - - - - - - $5,955
49,875
kWh
$1,268
108
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,717
Cost:
$13,055
$14,381 120,447 $4,086 348 - - $393 - $(-143) - $14,381
120,447
kWh
$4,086
348
kW-months/year
-
-
MMBtu
$393
-
$
$(-143)
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,385
Cost:
$9,100
- - - - $5,385 424 - - - - -
-
kWh
-
-
kW-months/year
$5,385
424
MMBtu
-
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$559
Cost:
$1,938
- - - - $559 44 - - - - -
-
kWh
-
-
kW-months/year
$559
44
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$145,997
Cost:
$65,950
$89,136 746,540 $24,619 2,096 $31,992 2,519 $393 - $(-143) - $89,136
746,540
kWh
$24,619
2,096
kW-months/year
$31,992
2,519
MMBtu
$393
-
$
$(-143)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost