Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2024 |
Principal Product | Milk, Yogurt, Ice cream, Butter |
NAICS | 311511 - Fluid Milk Manufacturing |
SIC | 2026 - Fluid Milk |
Sales | $50,000,000-$100,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 7,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $487,821 | 3,053,524 | kWh | $0.16 |
Electricity Demand | $195,726 | 7,931 | kW-months/year | $24.68 |
Electricity Fees | $2,928 | - | $ | - |
Natural Gas | $287,097 | 19,466 | MMBtu | $14.75 |
TOTAL ENERGY COSTS | $973,572 | |||
RECOMMENDED SAVINGS* | $226,720 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,003 Cost: $100 |
$3,304 | 20,673 | $699 | 28 | - | - | - | - | - | - |
$3,304 20,673 kWh |
$699 28 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $16,636 Cost: $2,272 |
$8,484 | 53,089 | - | - | $8,152 | 553 | - | - | - | - |
$8,484 53,089 kWh |
- - kW-months/year |
$8,152 553 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $16,386 Cost: $2,278 |
- | - | - | - | $17,686 | 1,199 | $(-1,300) | - | - | - |
- - kWh |
- - kW-months/year |
$17,686 1,199 MMBtu |
$(-1,300) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,117 Cost: $3,083 |
$18,117 | 113,375 | - | - | - | - | - | - | - | - |
$18,117 113,375 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2123 INSULATE FEEDWATER TANK |
Savings: $1,576 Cost: $1,977 |
- | - | - | - | $1,576 | 107 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,576 107 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $466 Cost: $1,170 |
$253 | 1,581 | $191 | 8 | - | - | $30 | - | $(-8) | - |
$253 1,581 kWh |
$191 8 kW-months/year |
- - MMBtu |
$30 - $ |
$(-8) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $17,789 Cost: $52,101 |
- | - | - | - | $17,789 | 1,206 | - | - | - | - |
- - kWh |
- - kW-months/year |
$17,789 1,206 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $4,505 Cost: $22,063 |
- | - | - | - | $4,505 | 305 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,505 305 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $5,729 Cost: $28,430 |
$5,729 | 35,854 | - | - | - | - | - | - | - | - |
$5,729 35,854 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $141,513 Cost: $823,750 |
$141,513 | 885,566 | - | - | - | - | - | - | - | - |
$141,513 885,566 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $226,720 Cost: $937,224 |
$177,400 | 1,110,138 | $890 | 36 | $49,708 | 3,370 | $(-1,270) | - | $(-8) | - | $177,400 1,110,138 kWh |
$890 36 kW-months/year |
$49,708 3,370 MMBtu |
$(-1,270) - $ |
$(-8) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material |