IAC logo
IAC Assessment: SJ0016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product Metal parts
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 10,000 Units
Production Hrs. Annual 4,335
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $408,137 2,715,998 kWh $0.15
Electricity Demand $319,012 7,330 kW-months/year $43.52
Natural Gas $116,229 7,523 MMBtu $15.45
LPG $9,774 271 MMBtu $36.13
TOTAL ENERGY COSTS $853,152
RECOMMENDED SAVINGS* $323,063 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$285,219
Cost:
$1,390,697
$264,378 1,759,338 $20,841 479 - - - - - - $264,378
1,759,338
kWh
$20,841
479
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,753
Cost:
$7,435
$3,309 22,021 $3,444 79 - - - - - - $3,309
22,021
kWh
$3,444
79
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,156
Cost:
$713
$645 4,290 $511 12 - - - - - - $645
4,290
kWh
$511
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,114
Cost:
$1,066
$2,263 15,060 $1,851 43 - - - - - - $2,263
15,060
kWh
$1,851
43
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$319
Cost:
$356
$177 1,179 $142 3 - - - - - - $177
1,179
kWh
$142
3
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$467
Cost:
-
$467 3,109 - - - - - - - - $467
3,109
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$464
Cost:
$315
$258 1,714 $206 5 - - - - - - $258
1,714
kWh
$206
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,500
Cost:
$987
$833 5,541 $667 15 - - - - - - $833
5,541
kWh
$667
15
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$541
Cost:
$692
$300 1,998 $241 6 - - - - - - $300
1,998
kWh
$241
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,999
Cost:
$271
$1,999 13,303 - - - - - - - - $1,999
13,303
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$140
Cost:
-
- - - - - - - - $140 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$140
-
$
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$33
Cost:
$38
$33 220 - - - - - - - - $33
220
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
13: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$1,169
Cost:
$6,473
- - - - - - $1,169 76 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,169
76
MMBtu
-
-
$
14: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$10,157
Cost:
-
- - - - - - $10,157 657 - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,157
657
MMBtu
-
-
$
15: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,627
Cost:
$9,934
$3,916 26,059 $711 16 - - - - - - $3,916
26,059
kWh
$711
16
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
16: 2.8112 COMBINE UTILITY METERS Savings:
$4,405
Cost:
-
- - - - $4,405 - - - - - -
-
kWh
-
-
kW-months/year
$4,405
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$323,063
Cost:
$1,418,977
$278,578 1,853,832 $28,614 657 $4,405 - $11,326 733 $140 - $278,578
1,853,832
kWh
$28,614
657
kW-months/year
$4,405
-
$
$11,326
733
MMBtu
$140
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost