Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Jose State University |
---|---|
Assessment Year | 2024 |
Principal Product | Cast iron and steel parts |
NAICS | 331511 - Iron Foundries |
SIC | 3321 - Gray And Ductile Iron Foundries |
Sales | $1,000,000-$5,000,000 |
# of Employees | 10 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 624,000 Pounds |
Production Hrs. Annual | 2,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $73,258 | 515,830 | kWh | $0.14 |
Electricity Demand | $38,852 | 8,439 | kW-months/year | $4.60 |
Natural Gas | $8,511 | 477 | MMBtu | $17.84 |
Fuel Oil #1 | $7,123 | 173 | MMBtu | $41.24 |
TOTAL ENERGY COSTS | $127,744 | |||
RECOMMENDED SAVINGS* | $94,600 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #1 | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #1 | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $246 Cost: $305 |
$207 | 1,456 | $39 | 8 | - | - | - | - | - | - | - | - | - | - |
$207 1,456 kWh |
$39 8 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $641 Cost: $72 |
$641 | 4,512 | - | - | - | - | - | - | - | - | - | - | - | - |
$641 4,512 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $585 Cost: - |
$535 | 3,764 | $50 | 11 | - | - | - | - | - | - | - | - | - | - |
$535 3,764 kWh |
$50 11 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $11,572 Cost: $10,571 |
$9,750 | 68,660 | $1,822 | 396 | - | - | - | - | - | - | - | - | - | - |
$9,750 68,660 kWh |
$1,822 396 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE |
Savings: $253 Cost: $332 |
$213 | 1,499 | $40 | 9 | - | - | - | - | - | - | - | - | - | - |
$213 1,499 kWh |
$40 9 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,178 Cost: $54 |
- | - | - | - | $4,178 | 234 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,178 234 MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $747 Cost: $6,433 |
$629 | 4,428 | $118 | 26 | - | - | - | - | - | - | - | - | - | - |
$629 4,428 kWh |
$118 26 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5221 RECYCLE CASTING SAND |
Savings: $75,618 Cost: $775,000 |
- | - | - | - | - | - | $7,123 | 1,344 | $29,900 | - | $(-1,185) | - | $39,780 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,123 1,344 MMBtu |
$29,900 - $ |
$(-1,185) - $ |
$39,780 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $760 Cost: $1,897 |
$748 | 5,267 | $12 | 3 | - | - | - | - | - | - | - | - | - | - |
$748 5,267 kWh |
$12 3 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $94,600 Cost: $794,664 |
$12,723 | 89,586 | $2,081 | 453 | $4,178 | 234 | $7,123 | 1,344 | $29,900 | - | $(-1,185) | - | $39,780 | - | $12,723 89,586 kWh |
$2,081 453 kW-months/year |
$4,178 234 MMBtu |
$7,123 1,344 MMBtu |
$29,900 - $ |
$(-1,185) - $ |
$39,780 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #1 | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #1 | Personnel Changes | Administrative Changes | Ancillary Material Cost |