IAC logo
IAC Assessment: SJ0025
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0025
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product Manufacturing Aeorspace, Defense, Semiconductor and Medical Parts
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 27,000
Annual Production 10,000 Units
Production Hrs. Annual 4,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $326,768 1,357,950 kWh $0.24
Electricity Demand $85,526 4,569 kW-months/year $18.72
Natural Gas $4,001 174 MMBtu $22.99
TOTAL ENERGY COSTS $416,295
RECOMMENDED SAVINGS* $124,202 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$67,207
Cost:
$14,360
$67,207 278,869 - - $67,207
278,869
kWh
-
-
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$991
Cost:
-
$991 4,111 - - $991
4,111
kWh
-
-
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,130
Cost:
$16,703
$3,393 14,080 $737 39 $3,393
14,080
kWh
$737
39
kW-months/year
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,936
Cost:
-
$6,936 28,780 - - $6,936
28,780
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$475
Cost:
$125
$390 1,619 $85 5 $390
1,619
kWh
$85
5
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,290
Cost:
-
$29,493 122,379 $1,797 96 $29,493
122,379
kWh
$1,797
96
kW-months/year
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,211
Cost:
$989
$1,211 5,025 - - $1,211
5,025
kWh
-
-
kW-months/year
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$522
Cost:
$2,897
$522 2,166 - - $522
2,166
kWh
-
-
kW-months/year
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$182
Cost:
$160
$182 757 - - $182
757
kWh
-
-
kW-months/year
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$11,258
Cost:
-
$11,258 46,715 - - $11,258
46,715
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$124,202
Cost:
$35,234
$121,583 504,501 $2,619 140 $121,583
504,501
kWh
$2,619
140
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand