IAC Assessment: SJ0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2025
Principal Product Treated Wastewater, Struvite
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 19
Plant Area (Sq.Ft.) 220,000
Annual Production 796,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $357,176 2,864,610 kWh $0.12
Electricity Demand $316,650 5,783 kW-months/year $54.76
Natural Gas $52,814 4,174 MMBtu $12.65
TOTAL ENERGY COSTS $726,640
RECOMMENDED SAVINGS* $138,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$129,492
Cost:
$206,023
$83,494 667,950 $45,998 840 - - - - $83,494
667,950
kWh
$45,998
840
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$400
Cost:
$297
- - - - $400 32 - - -
-
kWh
-
-
kW-months/year
$400
32
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$869
Cost:
-
$869 6,955 - - - - - - $869
6,955
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$5,400
Cost:
$34,907
- - - - - - $5,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,400
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,156
Cost:
$2,349
$776 6,208 $1,380 25 - - - - $776
6,208
kWh
$1,380
25
kW-months/year
-
-
MMBtu
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$123
Cost:
-
$123 986 - - - - - - $123
986
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$138,440
Cost:
$243,576
$85,262 682,099 $47,378 865 $400 32 $5,400 - $85,262
682,099
kWh
$47,378
865
kW-months/year
$400
32
MMBtu
$5,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost