IAC logo
IAC Assessment: ST0004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1984
Principal Product STEEL FABRICATIONS
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 400,000 Pounds
Production Hrs. Annual 2,875
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,436 182,005 kWh $0.13
Natural Gas $135 9 MMBtu $15.00
Fuel Oil #2 $5,727 700 MMBtu $8.18
Fuel Oil #4 $5,727 864 MMBtu $6.63
TOTAL ENERGY COSTS $35,025
RECOMMENDED SAVINGS* $8,550 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,550
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Fuel Oil #4 Electricity Usage Fuel Oil #2 Fuel Oil #4
$ kWh $ MMBtu $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$599
Cost:
$537
- - $315 41 $284 46 -
-
kWh
$315
41
MMBtu
$284
46
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,185
Cost:
$200
$1,185 9,086 - - - - $1,185
9,086
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,058
Cost:
$40
$1,058 8,206 - - - - $1,058
8,206
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$583
Cost:
$1,480
- - - - $583 94 -
-
kWh
-
-
MMBtu
$583
94
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$990
Cost:
$960
- - $520 67 $470 76 -
-
kWh
$520
67
MMBtu
$470
76
MMBtu
06: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$4,135
Cost:
$845
- - - - $4,135 598 -
-
kWh
-
-
MMBtu
$4,135
598
MMBtu
TOTAL RECOMMENDED Savings:
$8,550
Cost:
$4,062
$2,243 17,292 $835 108 $5,472 814 $2,243
17,292
kWh
$835
108
MMBtu
$5,472
814
MMBtu
TOTAL IMPLEMENTED Savings:
$8,550
Cost:
$4,062
$2,243 17,292 $835 108 $5,472 814 $2,243
17,292
kWh
$835
108
MMBtu
$5,472
814
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Fuel Oil #2 Fuel Oil #4 Electricity Usage Fuel Oil #2 Fuel Oil #4