Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Stevens Institute of Technology |
---|---|
Assessment Year | 1984 |
Principal Product | STEEL FABRICATIONS |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $1,000,000-$5,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 400,000 Pounds |
Production Hrs. Annual | 2,875 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $23,436 | 182,005 | kWh | $0.13 |
Natural Gas | $135 | 9 | MMBtu | $15.00 |
Fuel Oil #2 | $5,727 | 700 | MMBtu | $8.18 |
Fuel Oil #4 | $5,727 | 864 | MMBtu | $6.63 |
TOTAL ENERGY COSTS | $35,025 | |||
RECOMMENDED SAVINGS* | $8,550 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,550 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $599 Cost: $537 |
- | - | $315 | 41 | $284 | 46 |
- - kWh |
$315 41 MMBtu |
$284 46 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,185 Cost: $200 |
$1,185 | 9,086 | - | - | - | - |
$1,185 9,086 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,058 Cost: $40 |
$1,058 | 8,206 | - | - | - | - |
$1,058 8,206 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $583 Cost: $1,480 |
- | - | - | - | $583 | 94 |
- - kWh |
- - MMBtu |
$583 94 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $990 Cost: $960 |
- | - | $520 | 67 | $470 | 76 |
- - kWh |
$520 67 MMBtu |
$470 76 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH |
Savings: $4,135 Cost: $845 |
- | - | - | - | $4,135 | 598 |
- - kWh |
- - MMBtu |
$4,135 598 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $8,550 Cost: $4,062 |
$2,243 | 17,292 | $835 | 108 | $5,472 | 814 | $2,243 17,292 kWh |
$835 108 MMBtu |
$5,472 814 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,550 Cost: $4,062 |
$2,243 | 17,292 | $835 | 108 | $5,472 | 814 | $2,243 17,292 kWh |
$835 108 MMBtu |
$5,472 814 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | Electricity Usage | Fuel Oil #2 | Fuel Oil #4 |