Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Stevens Institute of Technology |
---|---|
Assessment Year | 1985 |
Principal Product | POWDERED METALS |
NAICS | n/a |
SIC | 3399 - Primary Metal Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 3,000 Tons |
Production Hrs. Annual | 8,736 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $726,749 | 10,502,052 | kWh | $0.07 |
Natural Gas | $161,917 | 27,485 | MMBtu | $5.89 |
LPG | $266,447 | 47,998 | MMBtu | $5.55 |
Fuel Oil #2 | $37,488 | 6,580 | MMBtu | $5.70 |
TOTAL ENERGY COSTS | $1,192,601 | |||
RECOMMENDED SAVINGS* | $47,195 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | LPG | Fuel Oil #2 | Electricity Usage | Natural Gas | LPG | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $292 Cost: $60 |
- | - | $208 | 35 | $84 | 15 | - | - |
- - kWh |
$208 35 MMBtu |
$84 15 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,867 Cost: $40 |
$6,867 | 99,355 | - | - | - | - | - | - |
$6,867 99,355 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $607 Cost: - |
$377 | 5,569 | $230 | 39 | - | - | - | - |
$377 5,569 kWh |
$230 39 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $706 Cost: $1,700 |
$1,109 | 16,120 | $(-403) | (-68) | - | - | - | - |
$1,109 16,120 kWh |
$(-403) (-68) MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $29,188 Cost: $16,200 |
- | - | - | - | - | - | $29,188 | 5,085 |
- - kWh |
- - MMBtu |
- - MMBtu |
$29,188 5,085 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT |
Savings: $6,181 Cost: - |
$7,605 | 109,906 | - | - | - | - | $(-1,424) | (-248) |
$7,605 109,906 kWh |
- - MMBtu |
- - MMBtu |
$(-1,424) (-248) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,096 Cost: $400 |
$(-76) | (-1,172) | $1,172 | 199 | - | - | - | - |
$(-76) (-1,172) kWh |
$1,172 199 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $712 Cost: $537 |
- | - | - | - | - | - | $712 | 124 |
- - kWh |
- - MMBtu |
- - MMBtu |
$712 124 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,391 Cost: $682 |
$1,391 | 20,223 | - | - | - | - | - | - |
$1,391 20,223 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT |
Savings: $155 Cost: $450 |
- | - | $442 | 75 | - | - | $(-287) | (-50) |
- - kWh |
$442 75 MMBtu |
- - MMBtu |
$(-287) (-50) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,195 Cost: $20,069 |
$17,273 | 250,001 | $1,649 | 280 | $84 | 15 | $28,189 | 4,911 | $17,273 250,001 kWh |
$1,649 280 MMBtu |
$84 15 MMBtu |
$28,189 4,911 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | LPG | Fuel Oil #2 | Electricity Usage | Natural Gas | LPG | Fuel Oil #2 |