IAC Assessment: ST0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product PROD. & MRKT. LEGAL SUPP
NAICS n/a
SIC 2761 - Manifold Business Forms
Sales $10,000,000-$50,000,000
# of Employees 375
Plant Area (Sq.Ft.) 0
Annual Production 2,500,000 Pounds
Production Hrs. Annual 2,800
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,921 1,732,415 kWh $0.09
Natural Gas $3,721 434 MMBtu $8.57
Fuel Oil #2 $16,093 2,479 MMBtu $6.49
TOTAL ENERGY COSTS $182,735
RECOMMENDED SAVINGS* $16,255 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,135
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,708
Cost:
$1,846
$4,708 50,117 - - - - $4,708
50,117
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$281
Cost:
$18
$281 2,931 - - - - $281
2,931
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$1,447
Cost:
-
$807 8,499 $640 76 - - $807
8,499
kWh
$640
76
MMBtu
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$892
Cost:
$420
$1,479 15,826 $(-587) (-70) - - $1,479
15,826
kWh
$(-587)
(-70)
MMBtu
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$833
Cost:
$1,080
$1,379 14,654 $(-546) (-65) - - $1,379
14,654
kWh
$(-546)
(-65)
MMBtu
-
-
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,090
Cost:
$83
$18 293 - - $1,072 165 $18
293
kWh
-
-
MMBtu
$1,072
165
MMBtu
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$5,609
Cost:
-
- - - - $5,609 864 -
-
kWh
-
-
MMBtu
$5,609
864
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,395
Cost:
$3,038
- - - - $1,395 215 -
-
kWh
-
-
MMBtu
$1,395
215
MMBtu
TOTAL RECOMMENDED Savings:
$16,255
Cost:
$6,485
$8,672 92,320 $(-493) (-59) $8,076 1,244 $8,672
92,320
kWh
$(-493)
(-59)
MMBtu
$8,076
1,244
MMBtu
TOTAL IMPLEMENTED Savings:
$13,135
Cost:
$1,947
$5,814 61,840 $640 76 $6,681 1,029 $5,814
61,840
kWh
$640
76
MMBtu
$6,681
1,029
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2