IAC Assessment: ST0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product METALIZED POLYESTER
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 61
Plant Area (Sq.Ft.) 0
Annual Production 600,000 Pounds
Production Hrs. Annual 4,100
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,286 555,393 kWh $0.09
Fuel Oil #4 $55,753 8,996 MMBtu $6.20
TOTAL ENERGY COSTS $107,039
RECOMMENDED SAVINGS* $15,314 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,624
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 Electricity Usage Natural Gas Fuel Oil #4
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,854
Cost:
$7,389
$4,854 52,462 - - - - $4,854
52,462
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$917
Cost:
$104
$917 9,965 - - - - $917
9,965
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$343
Cost:
-
$343 3,810 - - - - $343
3,810
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$478
Cost:
$870
$706 7,620 $(-228) (-33) - - $706
7,620
kWh
$(-228)
(-33)
MMBtu
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,556
Cost:
$1,020
- - - - $1,556 251 -
-
kWh
-
-
MMBtu
$1,556
251
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$391
Cost:
$900
- - - - $391 63 -
-
kWh
-
-
MMBtu
$391
63
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,510
Cost:
$537
- - - - $2,510 405 -
-
kWh
-
-
MMBtu
$2,510
405
MMBtu
08: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$3,038
Cost:
$935
- - - - $3,038 490 -
-
kWh
-
-
MMBtu
$3,038
490
MMBtu
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,227
Cost:
$2,200
- - - - $1,227 198 -
-
kWh
-
-
MMBtu
$1,227
198
MMBtu
TOTAL RECOMMENDED Savings:
$15,314
Cost:
$13,955
$6,820 73,857 $(-228) (-33) $8,722 1,407 $6,820
73,857
kWh
$(-228)
(-33)
MMBtu
$8,722
1,407
MMBtu
TOTAL IMPLEMENTED Savings:
$8,624
Cost:
$8,030
$6,114 66,237 - - $2,510 405 $6,114
66,237
kWh
-
-
MMBtu
$2,510
405
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #4 Electricity Usage Natural Gas Fuel Oil #4