IAC Assessment: ST0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1986
Principal Product TRADE SHOW EXHIBITS
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 236
Plant Area (Sq.Ft.) 0
Annual Production 800,000 Pieces
Production Hrs. Annual 8,125
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,905 2,064,185 kWh $0.09
Natural Gas $101,512 14,269 MMBtu $7.11
TOTAL ENERGY COSTS $295,417
RECOMMENDED SAVINGS* $27,441 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,283
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,796
Cost:
$80
$2,796 29,894 - - $2,796
29,894
kWh
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,101
Cost:
-
$1,101 11,723 - - $1,101
11,723
kWh
-
-
MMBtu
03: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$7,099
Cost:
$4,042
- - $7,099 1,018 -
-
kWh
$7,099
1,018
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$572
Cost:
$276
$572 6,155 - - $572
6,155
kWh
-
-
MMBtu
05: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$2,465
Cost:
-
$2,356 25,205 $109 15 $2,356
25,205
kWh
$109
15
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,448
Cost:
$3,000
$2,119 22,567 $(-671) (-96) $2,119
22,567
kWh
$(-671)
(-96)
MMBtu
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,690
Cost:
$9,000
$3,690 39,273 - - $3,690
39,273
kWh
-
-
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,822
Cost:
$1,000
- - $3,822 548 -
-
kWh
$3,822
548
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,448
Cost:
$1,596
$4,448 47,479 - - $4,448
47,479
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,441
Cost:
$18,994
$17,082 182,296 $10,359 1,485 $17,082
182,296
kWh
$10,359
1,485
MMBtu
TOTAL IMPLEMENTED Savings:
$17,283
Cost:
$5,122
$6,253 66,822 $11,030 1,581 $6,253
66,822
kWh
$11,030
1,581
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas