Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1986
Principal Product ELECTRICAL CONNECTORS
NAICS n/a
SIC 3644 - Noncurrent-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 0
Annual Production 9,000,000 Pieces
Production Hrs. Annual 6,375
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,275 1,659,144 kWh $0.11
Natural Gas $12,049 1,769 MMBtu $6.81
TOTAL ENERGY COSTS $186,324
RECOMMENDED SAVINGS* $98,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $94,088
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$47,801
Cost:
$60,000
$47,801 455,158 - - $47,801
455,158
kWh
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,121
Cost:
$500
- - $1,121 168 -
-
kWh
$1,121
168
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$930
Cost:
-
$930 8,792 - - $930
8,792
kWh
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,072
Cost:
$3,540
$2,844 26,964 $(-772) (-116) $2,844
26,964
kWh
$(-772)
(-116)
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,494
Cost:
$70
$4,494 42,790 - - $4,494
42,790
kWh
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,576
Cost:
-
$9,576 - - - $9,576
-
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,490
Cost:
$1,670
$1,490 14,068 - - $1,490
14,068
kWh
-
-
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,730
Cost:
$400
$1,730 16,413 - - $1,730
16,413
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,024
Cost:
$2,090
$29,024 276,377 - - $29,024
276,377
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$98,238
Cost:
$68,270
$97,889 840,562 $349 52 $97,889
840,562
kWh
$349
52
MMBtu
TOTAL IMPLEMENTED Savings:
$94,088
Cost:
$66,200
$93,739 801,289 $349 52 $93,739
801,289
kWh
$349
52
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas