Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2003 |
Principal Product | Heat Transfer Equipment |
NAICS | 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3440 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 295 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 100 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $353,731 | 5,035,200 | kWh | $0.07 |
Electricity Demand | $189,813 | 14,395 | kW-months/year | $13.19 |
Electricity Fees | $11,337 | - | $ | - |
Natural Gas | $250,256 | 35,253 | MMBtu | $7.10 |
TOTAL ENERGY COSTS | $886,667 | |||
RECOMMENDED SAVINGS* | $165,224 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $106,157 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $57,642 Cost: $93,355 |
$41,266 | 589,513 | $16,376 | 103 | - | - | - | - |
$41,266 589,513 kWh |
$16,376 103 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $42,094 Cost: $93,819 |
- | - | - | - | $42,094 | 5,929 | - | - |
- - kWh |
- - kW-months/year |
$42,094 5,929 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $30,876 Cost: $11,602 |
- | - | - | - | $25,071 | 3,521 | $5,805 | 1,608,100 |
- - kWh |
- - kW-months/year |
$25,071 3,521 MMBtu |
$5,805 1,608,100 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $12,993 Cost: $7,176 |
- | - | - | - | $12,993 | 1,830 | - | - |
- - kWh |
- - kW-months/year |
$12,993 1,830 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,229 Cost: $438 |
$5,229 | 74,706 | - | - | - | - | - | - |
$5,229 74,706 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $5,043 Cost: $16,501 |
- | - | $5,043 | 5,976 | - | - | - | - |
- - kWh |
$5,043 5,976 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $4,900 Cost: $16,700 |
- | - | - | - | - | - | $4,900 | 1,357,400 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,900 1,357,400 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $3,098 Cost: $12,105 |
- | - | - | - | $3,098 | 436 | - | - |
- - kWh |
- - kW-months/year |
$3,098 436 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,467 Cost: $163 |
$2,467 | 35,247 | - | - | - | - | - | - |
$2,467 35,247 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $882 Cost: $249 |
- | - | - | - | $882 | 12,594 | - | - |
- - kWh |
- - kW-months/year |
$882 12,594 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $165,224 Cost: $252,108 |
$48,962 | 699,466 | $21,419 | 6,079 | $84,138 | 24,310 | $10,705 | 2,965,500 | $48,962 699,466 kWh |
$21,419 6,079 kW-months/year |
$84,138 24,310 MMBtu |
$10,705 2,965,500 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $106,157 Cost: $138,759 |
$48,962 | 699,466 | $21,419 | 6,079 | $25,071 | 3,521 | $10,705 | 2,965,500 | $48,962 699,466 kWh |
$21,419 6,079 kW-months/year |
$25,071 3,521 MMBtu |
$10,705 2,965,500 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |