IAC Assessment: SU0155
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2003
Principal Product textile identification systems
NAICS 333244 - Printing Machinery and Equipment Manufacturing
SIC 3953 - Marking Devices
Sales $10,000,000-$50,000,000
# of Employees 94
Plant Area (Sq.Ft.) 42,270
Annual Production 1,800 Pieces
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,936 582,643 kWh $0.15
Electricity Demand $49,215 3,672 kW-months/year $13.40
Natural Gas $21,125 2,694 MMBtu $7.84
TOTAL ENERGY COSTS $172,668
RECOMMENDED SAVINGS* $57,657 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,321
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$20,634
Cost:
$768
- - - - - - - - $20,634 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$20,634
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$17,787
Cost:
$1,200
- - $17,787 1,327 - - - - - - -
-
kWh
$17,787
1,327
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$4,200
Cost:
$8,636
- - - - $4,200 536 - - - - -
-
kWh
-
-
kW-months/year
$4,200
536
MMBtu
-
-
lb
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,056
Cost:
-
- - - - - - - - $4,056 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,056
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,016
Cost:
-
- - - - - - $4,016 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,016
-
lb
-
-
$
06: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$2,195
Cost:
$4,877
- - - - $2,195 280 - - - - -
-
kWh
-
-
kW-months/year
$2,195
280
MMBtu
-
-
lb
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,755
Cost:
$320
$1,755 25,808 - - - - - - - - $1,755
25,808
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,406
Cost:
$420
- - - - $1,406 179 - - - - -
-
kWh
-
-
kW-months/year
$1,406
179
MMBtu
-
-
lb
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$901
Cost:
$1,660
- - - - $901 115 - - - - -
-
kWh
-
-
kW-months/year
$901
115
MMBtu
-
-
lb
-
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$381
Cost:
$500
- - - - $381 49 - - - - -
-
kWh
-
-
kW-months/year
$381
49
MMBtu
-
-
lb
-
-
$
11: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$326
Cost:
-
$326 4,792 - - - - - - - - $326
4,792
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$57,657
Cost:
$18,381
$2,081 30,600 $17,787 1,327 $9,083 1,159 $4,016 - $24,690 - $2,081
30,600
kWh
$17,787
1,327
kW-months/year
$9,083
1,159
MMBtu
$4,016
-
lb
$24,690
-
$
TOTAL IMPLEMENTED Savings:
$28,321
Cost:
$2,020
$2,081 30,600 $17,787 1,327 $381 49 $4,016 - $4,056 - $2,081
30,600
kWh
$17,787
1,327
kW-months/year
$381
49
MMBtu
$4,016
-
lb
$4,056
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes