IAC logo
IAC Assessment: SU0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2003
Principal Product Custom thermoformed plastic component parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 68,000
Annual Production 500,000 Pieces
Production Hrs. Annual 4,420
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,216 964,000 kWh $0.06
Electricity Demand $48,480 4,105 kW-months/year $11.81
TOTAL ENERGY COSTS $110,696
RECOMMENDED SAVINGS* $31,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,134
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$5,551
Cost:
-
- - $4,691 397 - - $860 - -
-
kWh
$4,691
397
kW-months/year
-
-
MMBtu
$860
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,251
Cost:
-
$1,514 21,632 $737 62 - - - - $1,514
21,632
kWh
$737
62
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,295
Cost:
-
- - $1,156 98 - - $139 - -
-
kWh
$1,156
98
kW-months/year
-
-
MMBtu
$139
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,662
Cost:
$85
$1,119 15,980 $543 46 - - - - $1,119
15,980
kWh
$543
46
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,037
Cost:
$227
$1,847 16,536 $1,190 101 - - - - $1,847
16,536
kWh
$1,190
101
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,579
Cost:
$9,450
$7,942 113,461 $3,637 308 - - - - $7,942
113,461
kWh
$3,637
308
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION Savings:
$5,735
Cost:
$18,000
$3,002 43,030 $4,691 397 $(-1,958) (-147) - - $3,002
43,030
kWh
$4,691
397
kW-months/year
$(-1,958)
(-147)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$31,110
Cost:
$27,762
$15,424 210,639 $16,645 1,409 $(-1,958) (-147) $999 - $15,424
210,639
kWh
$16,645
1,409
kW-months/year
$(-1,958)
(-147)
MMBtu
$999
-
$
TOTAL IMPLEMENTED Savings:
$12,134
Cost:
$227
$3,361 38,168 $7,774 658 - - $999 - $3,361
38,168
kWh
$7,774
658
kW-months/year
-
-
MMBtu
$999
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost