IAC logo
IAC Assessment: SU0173
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0173
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Nutritional/Diet Bars
NAICS 311352 - Confectionery Manufacturing from Purchased Chocolate
SIC 2064 - Candy & Other Confectionery Products
Sales $10,000,000-$50,000,000
# of Employees 78
Plant Area (Sq.Ft.) 61,600
Annual Production 70,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,850 1,512,900 kWh $0.06
Electricity Demand $37,863 3,606 kW-months/year $10.50
Electricity Fees $16,968 - $ -
TOTAL ENERGY COSTS $144,681
RECOMMENDED SAVINGS* $37,256 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,920
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$13,244
Cost:
-
- - - - - - $13,244 - -
-
kWh
-
-
kW-months/year
-
-
$
$13,244
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,991
Cost:
-
$2,882 41,170 $1,109 106 - - - - $2,882
41,170
kWh
$1,109
106
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$919
Cost:
$57
$756 10,800 $163 15 - - - - $756
10,800
kWh
$163
15
kW-months/year
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,102
Cost:
$117
$797 11,384 $305 29 - - - - $797
11,384
kWh
$305
29
kW-months/year
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,444
Cost:
$4,290
$1,846 26,374 $1,598 152 - - - - $1,846
26,374
kWh
$1,598
152
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,001
Cost:
$9,164
$3,171 45,302 $1,830 174 - - - - $3,171
45,302
kWh
$1,830
174
kW-months/year
-
-
$
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$9,555
Cost:
$48,418
$2,869 40,988 $3,311 315 $3,375 - - - $2,869
40,988
kWh
$3,311
315
kW-months/year
$3,375
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$37,256
Cost:
$62,046
$12,321 176,018 $8,316 791 $3,375 - $13,244 - $12,321
176,018
kWh
$8,316
791
kW-months/year
$3,375
-
$
$13,244
-
$
TOTAL IMPLEMENTED Savings:
$5,920
Cost:
$9,221
$3,927 56,102 $1,993 189 - - - - $3,927
56,102
kWh
$1,993
189
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes