IAC Assessment: SU0272
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0272
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2008
Principal Product Healthy and Organic Snacks
NAICS 311919 - Other Snack Food Manufacturing
SIC 2096 - Potato Chips And Similar Snacks
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 350,000
Annual Production 22,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $437,900 5,927,727 kWh $0.07
Electricity Demand $146,528 17,001 kW-months/year $8.62
Electricity Fees $23,062 - $ -
TOTAL ENERGY COSTS $607,490
RECOMMENDED SAVINGS* $152,651 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,237
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$67,532
Cost:
-
- - - - $67,532 - -
-
kWh
-
-
kW-months/year
$67,532
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$21,466
Cost:
-
- - $21,466 2,496 - - -
-
kWh
$21,466
2,496
kW-months/year
-
-
$
03: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$19,882
Cost:
-
- - - - $19,882 - -
-
kWh
-
-
kW-months/year
$19,882
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,013
Cost:
-
$6,482 88,800 $1,531 178 - - $6,482
88,800
kWh
$1,531
178
kW-months/year
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,164
Cost:
$173
$3,373 46,200 $791 92 - - $3,373
46,200
kWh
$791
92
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,414
Cost:
$535
$2,414 33,075 - - - - $2,414
33,075
kWh
-
-
kW-months/year
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,418
Cost:
$1,650
$9,242 126,600 $2,176 253 - - $9,242
126,600
kWh
$2,176
253
kW-months/year
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,762
Cost:
$31,086
$14,365 196,800 $3,397 395 - - $14,365
196,800
kWh
$3,397
395
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$152,651
Cost:
$33,444
$35,876 491,475 $29,361 3,414 $87,414 - $35,876
491,475
kWh
$29,361
3,414
kW-months/year
$87,414
-
$
TOTAL IMPLEMENTED Savings:
$65,237
Cost:
$33,444
$35,876 491,475 $29,361 3,414 - - $35,876
491,475
kWh
$29,361
3,414
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes