IAC Assessment: SU0298
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0298
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2010
Principal Product Aluminum Foundry
NAICS 331524 - Aluminum Foundries (except Die-Casting)
SIC 3365 - Aluminum Foundries
Sales $10,000,000-$50,000,000
# of Employees 51
Plant Area (Sq.Ft.) 250,000
Annual Production 106,000 Units
Production Hrs. Annual 4,250
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,852 4,530,777 kWh $0.05
Electricity Demand $123,981 12,804 kW-months/year $9.68
Electricity Fees $21,427 - $ -
Natural Gas $491,460 61,426 MMBtu $8.00
TOTAL ENERGY COSTS $858,720
RECOMMENDED SAVINGS* $90,464 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$21,457
Cost:
-
- - - - - - - - $21,457 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$21,457
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,096
Cost:
-
$3,096 51,600 - - - - - - - - $3,096
51,600
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,218
Cost:
$1,248
- - - - - - $9,218 1,418 - - -
-
kWh
-
-
kW-months/year
-
-
$
$9,218
1,418
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$431
Cost:
$86
$228 3,804 $203 21 - - - - - - $228
3,804
kWh
$203
21
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$792
Cost:
$266
$792 13,200 - - - - - - - - $792
13,200
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$125
Cost:
$274
$125 2,079 - - - - - - - - $125
2,079
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$35,873
Cost:
$81,798
$(-1,919) (-70,125) $(-4,208) (-198) - - - - $42,000 - $(-1,919)
(-70,125)
kWh
$(-4,208)
(-198)
kW-months/year
-
-
$
-
-
MMBtu
$42,000
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,123
Cost:
$45,613
$10,385 173,063 $4,738 489 - - - - - - $10,385
173,063
kWh
$4,738
489
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,349
Cost:
$17,933
- - - - $4,349 - - - - - -
-
kWh
-
-
kW-months/year
$4,349
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$90,464
Cost:
$147,218
$12,707 173,621 $733 312 $4,349 - $9,218 1,418 $63,457 - $12,707
173,621
kWh
$733
312
kW-months/year
$4,349
-
$
$9,218
1,418
MMBtu
$63,457
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost